Land values in the Cumberland local government area
Sydney Central region
General overview
Land values in the Cumberland local government area have shown a very strong increase between July 2021 and July 2022. This trend is consistent across most of market segments except for residential that experienced strong increases.
Increases in land values were largely driven by the district’s central location within the Sydney metropolitan area, its good transport links to the Sydney CBD and other areas of Sydney, and its proximity to the Parramatta CBD. There has been high sales activity and increased sale prices, across the zones, which have led to very strong increases overall.
Land value trends
Property zone | 01 Jul 2021 | 01 Jul 2022 | % change |
---|---|---|---|
Residential | $40,761,651,500 | $50,239,701,275 | 23.3% |
Commercial | $2,345,447,440 | $3,066,192,957 | 30.7% |
Industrial | $5,886,482,670 | $8,748,915,630 | 48.6% |
Other | $615,274,590 | $690,424,362 | 12.2% |
Total | $49,608,856,200 | $62,745,234,224 | 26.5% |
Number of properties by zone
Total number of properties: 50,956
Residential land values
Residential overview
Residential land values have increased strongly overall between July 2021 and July 2022, whilst mixed use land values in the town centre of Auburn remained steady with moderate increases shown at Granville and Guildford. Medium density housing sites in the suburbs west of the Parramatta CBD such as Girraween, Greystanes, Guildford, Merrylands, Merrylands West, Wentworthville, South Wentworthville and Westmead showed only slight changes in land values.
A key driver of residential values are sites with potential for dual occupancy redevelopment or secondary dwellings, due to a broad demographic and being a relatively more affordable option in a locality that is well connected to greater Sydney.
Median land values and sale prices
The above chart shows movement in the property market and land values over a five year period. In areas where there are a low number of sales, median sale prices may not accurately reflect the property market. Land values may not always move directly in line with sale prices due to the influence of other factors, such as building costs.
Typical residential land values
Address | 01 Jul 2021 | 01 Jul 2022 | % change |
---|---|---|---|
Auburn Rd, Auburn | $1,420,000 | $1,420,000 | 0.0% |
Cumberland Rd, Auburn | $760,000 | $890,000 | 17.1% |
Union Rd, Auburn | $770,000 | $900,000 | 16.9% |
Wellington Rd, Auburn | $750,000 | $880,000 | 17.3% |
Leila St, Berala | $775,000 | $920,000 | 18.7% |
The Crescent , Berala | $13,500 | $15,000 | 11.1% |
Carinya Rd, Girraween | $1,680,000 | $1,750,000 | 4.2% |
Lyle St, Girraween | $700,000 | $940,000 | 34.3% |
Blaxcell St, Granville | $608,000 | $750,000 | 23.4% |
Carlton St, Granville | $872,000 | $941,000 | 7.9% |
William St, Granville | $2,450,000 | $2,700,000 | 10.2% |
Alpha Rd, Greystanes | $640,000 | $900,000 | 40.6% |
Montague St, Greystanes | $669,000 | $900,000 | 34.5% |
Roberta St, Greystanes | $682,000 | $930,000 | 36.4% |
George St, Guildford | $651,000 | $768,000 | 18.0% |
Henry St, Guildford | $2,090,000 | $2,200,000 | 5.3% |
Railway Tce, Guildford | $704,000 | $891,000 | 26.6% |
Phillip St, Guildford West | $660,000 | $805,000 | 22.0% |
Cameron St, Lidcombe | $2,100,000 | $2,500,000 | 19.1% |
College St, Lidcombe | $744,000 | $900,000 | 21.0% |
Delhi St, Lidcombe | $980,000 | $1,220,000 | 24.5% |
Frederick St, Lidcombe | $940,000 | $1,020,000 | 8.5% |
Joseph St, Lidcombe | $1,670,000 | $2,200,000 | 31.7% |
Nottinghill Rd, Lidcombe | $940,000 | $1,220,000 | 29.8% |
Meadows St, Merrylands | $650,000 | $840,000 | 29.2% |
Merrylands Rd, Merrylands | $820,000 | $1,150,000 | 40.2% |
Shannon Ave, Merrylands | $768,000 | $980,000 | 27.6% |
Josephine St, Merrylands West | $646,000 | $778,000 | 20.4% |
Waiana St, Pemulwuy | $524,000 | $675,000 | 28.8% |
Lavinia St, South Granville | $688,000 | $820,000 | 19.2% |
Hamilton St, South Wentworthville | $807,000 | $1,050,000 | 30.1% |
Station St, Wentworthville | $689,000 | $890,000 | 29.2% |
School Pde, Westmead | $1,010,000 | $1,280,000 | 26.7% |
Commercial land values
Commercial overview
Land values of commercial properties increased very strongly overall between July 2021 and July 2022. Sustained sales volumes and sale prices compared to the prior year supported continuing increases in land values with local commercial centres being more in demand due to more flexible working conditions.
Local council planning and investment in several centres is also supporting the growth in commercial land values. Examples being the Wentworthville Centre Revitalisation initiative, improvements to public domain space and residential growth within town centres.
The Cumberland LGA is located at the geographic heart of the Greater Sydney Region, and is well positioned to City of Parramatta CBD, Western Sydney Employment Area and the future Western Sydney Airport.
Employment and innovation land in Cumberland are well connected with the arterial road network and freight rail network, making it highly accessible to various distribution catchments across the Greater Sydney Region.
Typical commercial land values
Address | 01 Jul 2021 | 01 Jul 2022 | % change |
---|---|---|---|
Newton St, Auburn | $970,000 | $1,500,000 | 54.6% |
Parramatta Rd, Auburn | $13,500,000 | $17,000,000 | 25.9% |
Railway Pde, Granville | $1,220,000 | $1,600,000 | 31.2% |
South St, Granville | $720,000 | $902,000 | 25.3% |
Great Western Hwy, Greystanes | $2,650,000 | $4,000,000 | 50.9% |
Parramatta Rd, Lidcombe | $2,290,000 | $2,950,000 | 28.8% |
Belinda Pl, Mays Hill | $810,000 | $950,000 | 17.3% |
Merrylands Rd, Merrylands | $484,000 | $575,000 | 18.8% |
Prospect Hwy, Pemulwuy | $37,000,000 | $50,000,000 | 35.1% |
Amy St, Regents Park | $475,000 | $610,000 | 28.4% |
Dunmore St, Wentworthville | $825,000 | $950,000 | 15.2% |
Industrial land values
Industrial overview
Land values of industrial properties increased very strongly overall between July 2021 and July 2022.
This was due to continued demand for industrial sites, particularly large sites (over 1-hectare) for future redevelopment or use within the strong performing areas of logistics, e-commerce and growing demand for large data centres. The strong increases being supported by robust sale volumes across the local government area’s many industrial precincts.
Industrial precincts of the Cumberland local government area are well positioned with access to current state significant infrastructure projects. It is also strategically located between the developing Western Sydney airport and Parramatta Central Business District with many precincts having direct access to major transport links like the M4 Motorway and Cumberland Highway.
Typical industrial land values
Address | 01 Jul 2021 | 01 Jul 2022 | % change |
---|---|---|---|
Byrne St, Auburn | $1,900,000 | $3,000,000 | 57.9% |
Chisholm Rd, Auburn | $8,000,000 | $12,000,000 | 50.0% |
Hampstead Rd, Auburn | $825,000 | $1,150,000 | 39.4% |
Mandoon Rd, Girraween | $2,400,000 | $3,850,000 | 60.4% |
Cann St, Guildford | $2,720,000 | $4,130,000 | 51.8% |
Carrington Rd, Guildford | $590,000 | $880,000 | 49.2% |
Railway Tce, Guildford | $2,700,000 | $4,100,000 | 51.9% |
Railway Tce, Merrylands | $129,000 | $161,000 | 24.8% |
Basalt Rd, Pemulwuy | $19,000,000 | $25,000,000 | 31.6% |
Long St, Smithfield | $1,450,000 | $2,150,000 | 48.3% |
Percival Rd, Smithfield | $36,500,000 | $47,500,000 | 30.1% |
Woodpark Rd, Smithfield | $5,300,000 | $8,200,000 | 54.7% |
Added value of improvement tables
The added value of improvement tables show dollar values per square metre for the added value of improvements for the main residential property types in a local government area. It is the value the improvements add to the value of the land as demonstrated by the analysis of property sales.
Added value of improvement
Construction /Style |
Age | Size | Condition | Lower Value |
Higher Value |
---|---|---|---|---|---|
Brick Veneer | 1940 - 1959 | <=120m2 | AS NEW | $2,100 | $2,900 |
Brick Veneer | 1940 - 1959 | <=120m2 | GOOD | $1,600 | $2,250 |
Brick Veneer | 1940 - 1959 | <=120m2 | FAIR | $1,200 | $1,700 |
Brick Veneer | 1940 - 1959 | <=120m2 | POOR | $650 | $1,200 |
Brick Veneer | 1940 - 1959 | 121 - 200m2 | AS NEW | $2,050 | $2,850 |
Brick Veneer | 1940 - 1959 | 121 - 200m2 | GOOD | $1,550 | $2,200 |
Brick Veneer | 1940 - 1959 | 121 - 200m2 | FAIR | $1,150 | $1,650 |
Brick Veneer | 1940 - 1959 | 121 - 200m2 | POOR | $650 | $1,200 |
Brick Veneer | 1940 - 1959 | 201 - 300m2 | AS NEW | $2,050 | $2,850 |
Brick Veneer | 1940 - 1959 | 201 - 300m2 | GOOD | $1,550 | $2,200 |
Brick Veneer | 1940 - 1959 | 201 - 300m2 | FAIR | $1,150 | $1,650 |
Brick Veneer | 1940 - 1959 | 201 - 300m2 | POOR | $650 | $1,200 |
Brick Veneer | 1940 - 1959 | >=301m2 | AS NEW | $2,000 | $2,800 |
Brick Veneer | 1940 - 1959 | >=301m2 | GOOD | $1,500 | $2,150 |
Brick Veneer | 1940 - 1959 | >=301m2 | FAIR | $1,100 | $1,600 |
Brick Veneer | 1940 - 1959 | >=301m2 | POOR | $650 | $1,200 |
Brick Veneer | 1960 - 1999 | <=120m2 | AS NEW | $2,150 | $2,950 |
Brick Veneer | 1960 - 1999 | <=120m2 | GOOD | $1,650 | $2,300 |
Brick Veneer | 1960 - 1999 | <=120m2 | FAIR | $1,250 | $1,750 |
Brick Veneer | 1960 - 1999 | <=120m2 | POOR | $650 | $1,200 |
Brick Veneer | 1960 - 1999 | 121 - 200m2 | AS NEW | $2,100 | $2,900 |
Brick Veneer | 1960 - 1999 | 121 - 200m2 | GOOD | $1,600 | $2,250 |
Brick Veneer | 1960 - 1999 | 121 - 200m2 | FAIR | $1,200 | $1,700 |
Brick Veneer | 1960 - 1999 | 121 - 200m2 | POOR | $650 | $1,200 |
Brick Veneer | 1960 - 1999 | 201 - 300m2 | AS NEW | $2,100 | $2,900 |
Brick Veneer | 1960 - 1999 | 201 - 300m2 | GOOD | $1,600 | $2,250 |
Brick Veneer | 1960 - 1999 | 201 - 300m2 | FAIR | $1,200 | $1,700 |
Brick Veneer | 1960 - 1999 | 201 - 300m2 | POOR | $650 | $1,200 |
Brick Veneer | 1960 - 1999 | >=301m2 | AS NEW | $2,050 | $2,850 |
Brick Veneer | 1960 - 1999 | >=301m2 | GOOD | $1,550 | $2,200 |
Brick Veneer | 1960 - 1999 | >=301m2 | FAIR | $1,150 | $1,650 |
Brick Veneer | 1960 - 1999 | >=301m2 | POOR | $650 | $1,200 |
Brick Veneer | 2000 - current | <=120m2 | AS NEW | $2,200 | $3,000 |
Brick Veneer | 2000 - current | <=120m2 | GOOD | $1,700 | $2,350 |
Brick Veneer | 2000 - current | <=120m2 | FAIR | $1,200 | $1,700 |
Brick Veneer | 2000 - current | <=120m2 | POOR | $650 | $1,200 |
Brick Veneer | 2000 - current | 121 - 200m2 | AS NEW | $2,150 | $2,950 |
Brick Veneer | 2000 - current | 121 - 200m2 | GOOD | $1,650 | $2,300 |
Brick Veneer | 2000 - current | 121 - 200m2 | FAIR | $1,150 | $1,650 |
Brick Veneer | 2000 - current | 121 - 200m2 | POOR | $650 | $1,200 |
Brick Veneer | 2000 - current | 201 - 300m2 | AS NEW | $2,150 | $2,950 |
Brick Veneer | 2000 - current | 201 - 300m2 | GOOD | $1,650 | $2,300 |
Brick Veneer | 2000 - current | 201 - 300m2 | FAIR | $1,150 | $1,650 |
Brick Veneer | 2000 - current | 201 - 300m2 | POOR | $650 | $1,200 |
Brick Veneer | 2000 - current | >=301m2 | AS NEW | $2,100 | $2,900 |
Brick Veneer | 2000 - current | >=301m2 | GOOD | $1,600 | $2,250 |
Brick Veneer | 2000 - current | >=301m2 | FAIR | $1,100 | $1,600 |
Brick Veneer | 2000 - current | >=301m2 | POOR | $650 | $1,200 |
Concrete | Pre 1930 | <=120m2 | AS NEW | $2,150 | $2,950 |
Concrete | Pre 1930 | <=120m2 | GOOD | $1,750 | $2,400 |
Concrete | Pre 1930 | <=120m2 | FAIR | $1,250 | $1,750 |
Concrete | Pre 1930 | <=120m2 | POOR | $650 | $1,200 |
Concrete | Pre 1930 | 121 - 200m2 | AS NEW | $2,100 | $2,900 |
Concrete | Pre 1930 | 121 - 200m2 | GOOD | $1,700 | $2,350 |
Concrete | Pre 1930 | 121 - 200m2 | FAIR | $1,200 | $1,700 |
Concrete | Pre 1930 | 121 - 200m2 | POOR | $650 | $1,200 |
Concrete | Pre 1930 | 201 - 300m2 | AS NEW | $2,100 | $2,900 |
Concrete | Pre 1930 | 201 - 300m2 | GOOD | $1,700 | $2,350 |
Concrete | Pre 1930 | 201 - 300m2 | FAIR | $1,200 | $1,700 |
Concrete | Pre 1930 | 201 - 300m2 | POOR | $650 | $1,200 |
Concrete | Pre 1930 | >=301m2 | AS NEW | $2,050 | $2,850 |
Concrete | Pre 1930 | >=301m2 | GOOD | $1,650 | $2,300 |
Concrete | Pre 1930 | >=301m2 | FAIR | $1,150 | $1,650 |
Concrete | Pre 1930 | >=301m2 | POOR | $650 | $1,200 |
Concrete | 1930 - 1939 | <=120m2 | AS NEW | $2,200 | $3,000 |
Concrete | 1930 - 1939 | <=120m2 | GOOD | $1,800 | $2,450 |
Concrete | 1930 - 1939 | <=120m2 | FAIR | $1,300 | $1,800 |
Concrete | 1930 - 1939 | <=120m2 | POOR | $650 | $1,200 |
Concrete | 1930 - 1939 | 121 - 200m2 | AS NEW | $2,150 | $2,950 |
Concrete | 1930 - 1939 | 121 - 200m2 | GOOD | $1,750 | $2,400 |
Concrete | 1930 - 1939 | 121 - 200m2 | FAIR | $1,250 | $1,750 |
Concrete | 1930 - 1939 | 121 - 200m2 | POOR | $650 | $1,200 |
Concrete | 1930 - 1939 | 201 - 300m2 | AS NEW | $2,150 | $2,950 |
Concrete | 1930 - 1939 | 201 - 300m2 | GOOD | $1,750 | $2,400 |
Concrete | 1930 - 1939 | 201 - 300m2 | FAIR | $1,250 | $1,750 |
Concrete | 1930 - 1939 | 201 - 300m2 | POOR | $650 | $1,200 |
Concrete | 1930 - 1939 | >=301m2 | AS NEW | $2,100 | $2,900 |
Concrete | 1930 - 1939 | >=301m2 | GOOD | $1,700 | $2,350 |
Concrete | 1930 - 1939 | >=301m2 | FAIR | $1,200 | $1,700 |
Concrete | 1930 - 1939 | >=301m2 | POOR | $650 | $1,200 |
Concrete | 1940 - 1959 | <=120m2 | AS NEW | $2,200 | $3,000 |
Concrete | 1940 - 1959 | <=120m2 | GOOD | $1,800 | $2,450 |
Concrete | 1940 - 1959 | <=120m2 | FAIR | $1,300 | $1,800 |
Concrete | 1940 - 1959 | <=120m2 | POOR | $650 | $1,200 |
Concrete | 1940 - 1959 | 121 - 200m2 | AS NEW | $2,150 | $2,950 |
Concrete | 1940 - 1959 | 121 - 200m2 | GOOD | $1,750 | $2,400 |
Concrete | 1940 - 1959 | 121 - 200m2 | FAIR | $1,250 | $1,750 |
Concrete | 1940 - 1959 | 121 - 200m2 | POOR | $650 | $1,200 |
Concrete | 1940 - 1959 | 201 - 300m2 | AS NEW | $2,150 | $2,950 |
Concrete | 1940 - 1959 | 201 - 300m2 | GOOD | $1,750 | $2,400 |
Concrete | 1940 - 1959 | 201 - 300m2 | FAIR | $1,250 | $1,750 |
Concrete | 1940 - 1959 | 201 - 300m2 | POOR | $650 | $1,200 |
Concrete | 1940 - 1959 | >=301m2 | AS NEW | $2,100 | $2,900 |
Concrete | 1940 - 1959 | >=301m2 | GOOD | $1,700 | $2,350 |
Concrete | 1940 - 1959 | >=301m2 | FAIR | $1,200 | $1,700 |
Concrete | 1940 - 1959 | >=301m2 | POOR | $650 | $1,200 |
Concrete | 1960 - 1999 | <=120m2 | AS NEW | $2,250 | $3,050 |
Concrete | 1960 - 1999 | <=120m2 | GOOD | $1,850 | $2,500 |
Concrete | 1960 - 1999 | <=120m2 | FAIR | $1,350 | $1,850 |
Concrete | 1960 - 1999 | <=120m2 | POOR | $650 | $1,200 |
Concrete | 1960 - 1999 | 121 - 200m2 | AS NEW | $2,200 | $3,000 |
Concrete | 1960 - 1999 | 121 - 200m2 | GOOD | $1,800 | $2,450 |
Concrete | 1960 - 1999 | 121 - 200m2 | FAIR | $1,300 | $1,800 |
Concrete | 1960 - 1999 | 121 - 200m2 | POOR | $650 | $1,200 |
Concrete | 1960 - 1999 | 201 - 300m2 | AS NEW | $2,200 | $3,000 |
Concrete | 1960 - 1999 | 201 - 300m2 | GOOD | $1,800 | $2,450 |
Concrete | 1960 - 1999 | 201 - 300m2 | FAIR | $1,300 | $1,800 |
Concrete | 1960 - 1999 | 201 - 300m2 | POOR | $650 | $1,200 |
Concrete | 1960 - 1999 | >=301m2 | AS NEW | $2,150 | $2,950 |
Concrete | 1960 - 1999 | >=301m2 | GOOD | $1,750 | $2,400 |
Concrete | 1960 - 1999 | >=301m2 | FAIR | $1,250 | $1,750 |
Concrete | 1960 - 1999 | >=301m2 | POOR | $650 | $1,200 |
Concrete | 2000 - current | <=120m2 | AS NEW | $2,300 | $3,100 |
Concrete | 2000 - current | <=120m2 | GOOD | $1,800 | $2,450 |
Concrete | 2000 - current | <=120m2 | FAIR | $1,300 | $1,800 |
Concrete | 2000 - current | <=120m2 | POOR | $650 | $1,200 |
Concrete | 2000 - current | 121 - 200m2 | AS NEW | $2,250 | $3,050 |
Concrete | 2000 - current | 121 - 200m2 | GOOD | $1,750 | $2,400 |
Concrete | 2000 - current | 121 - 200m2 | FAIR | $1,250 | $1,750 |
Concrete | 2000 - current | 121 - 200m2 | POOR | $650 | $1,200 |
Concrete | 2000 - current | 201 - 300m2 | AS NEW | $2,250 | $3,050 |
Concrete | 2000 - current | 201 - 300m2 | GOOD | $1,750 | $2,400 |
Concrete | 2000 - current | 201 - 300m2 | FAIR | $1,250 | $1,750 |
Concrete | 2000 - current | 201 - 300m2 | POOR | $650 | $1,200 |
Concrete | 2000 - current | >=301m2 | AS NEW | $2,200 | $3,000 |
Concrete | 2000 - current | >=301m2 | GOOD | $1,700 | $2,350 |
Concrete | 2000 - current | >=301m2 | FAIR | $1,200 | $1,700 |
Concrete | 2000 - current | >=301m2 | POOR | $650 | $1,200 |
Concrete block | Pre 1930 | <=120m2 | AS NEW | $2,150 | $2,950 |
Concrete block | Pre 1930 | <=120m2 | GOOD | $1,750 | $2,400 |
Concrete block | Pre 1930 | <=120m2 | FAIR | $1,250 | $1,750 |
Concrete block | Pre 1930 | <=120m2 | POOR | $650 | $1,200 |
Concrete block | Pre 1930 | 121 - 200m2 | AS NEW | $2,100 | $2,900 |
Concrete block | Pre 1930 | 121 - 200m2 | GOOD | $1,700 | $2,350 |
Concrete block | Pre 1930 | 121 - 200m2 | FAIR | $1,200 | $1,700 |
Concrete block | Pre 1930 | 121 - 200m2 | POOR | $650 | $1,200 |
Concrete block | Pre 1930 | 201 - 300m2 | AS NEW | $2,100 | $2,900 |
Concrete block | Pre 1930 | 201 - 300m2 | GOOD | $1,700 | $2,350 |
Concrete block | Pre 1930 | 201 - 300m2 | FAIR | $1,200 | $1,700 |
Concrete block | Pre 1930 | 201 - 300m2 | POOR | $650 | $1,200 |
Concrete block | Pre 1930 | >=301m2 | AS NEW | $2,050 | $2,850 |
Concrete block | Pre 1930 | >=301m2 | GOOD | $1,650 | $2,300 |
Concrete block | Pre 1930 | >=301m2 | FAIR | $1,150 | $1,650 |
Concrete block | Pre 1930 | >=301m2 | POOR | $650 | $1,200 |
Concrete block | 1930 - 1939 | <=120m2 | AS NEW | $2,200 | $3,000 |
Concrete block | 1930 - 1939 | <=120m2 | GOOD | $1,800 | $2,450 |
Concrete block | 1930 - 1939 | <=120m2 | FAIR | $1,300 | $1,800 |
Concrete block | 1930 - 1939 | <=120m2 | POOR | $650 | $1,200 |
Concrete block | 1930 - 1939 | 121 - 200m2 | AS NEW | $2,150 | $2,950 |
Concrete block | 1930 - 1939 | 121 - 200m2 | GOOD | $1,750 | $2,400 |
Concrete block | 1930 - 1939 | 121 - 200m2 | FAIR | $1,250 | $1,750 |
Concrete block | 1930 - 1939 | 121 - 200m2 | POOR | $650 | $1,200 |
Concrete block | 1930 - 1939 | 201 - 300m2 | AS NEW | $2,150 | $2,950 |
Concrete block | 1930 - 1939 | 201 - 300m2 | GOOD | $1,750 | $2,400 |
Concrete block | 1930 - 1939 | 201 - 300m2 | FAIR | $1,250 | $1,750 |
Concrete block | 1930 - 1939 | 201 - 300m2 | POOR | $650 | $1,200 |
Concrete block | 1930 - 1939 | >=301m2 | AS NEW | $2,100 | $2,900 |
Concrete block | 1930 - 1939 | >=301m2 | GOOD | $1,700 | $2,350 |
Concrete block | 1930 - 1939 | >=301m2 | FAIR | $1,200 | $1,700 |
Concrete block | 1930 - 1939 | >=301m2 | POOR | $650 | $1,200 |
Concrete block | 1940 - 1959 | <=120m2 | AS NEW | $2,200 | $3,000 |
Concrete block | 1940 - 1959 | <=120m2 | GOOD | $1,800 | $2,450 |
Concrete block | 1940 - 1959 | <=120m2 | FAIR | $1,300 | $1,800 |
Concrete block | 1940 - 1959 | <=120m2 | POOR | $650 | $1,200 |
Concrete block | 1940 - 1959 | 121 - 200m2 | AS NEW | $2,150 | $2,950 |
Concrete block | 1940 - 1959 | 121 - 200m2 | GOOD | $1,750 | $2,400 |
Concrete block | 1940 - 1959 | 121 - 200m2 | FAIR | $1,250 | $1,750 |
Concrete block | 1940 - 1959 | 121 - 200m2 | POOR | $650 | $1,200 |
Concrete block | 1940 - 1959 | 201 - 300m2 | AS NEW | $2,150 | $2,950 |
Concrete block | 1940 - 1959 | 201 - 300m2 | GOOD | $1,750 | $2,400 |
Concrete block | 1940 - 1959 | 201 - 300m2 | FAIR | $1,250 | $1,750 |
Concrete block | 1940 - 1959 | 201 - 300m2 | POOR | $650 | $1,200 |
Concrete block | 1940 - 1959 | >=301m2 | AS NEW | $2,100 | $2,900 |
Concrete block | 1940 - 1959 | >=301m2 | GOOD | $1,700 | $2,350 |
Concrete block | 1940 - 1959 | >=301m2 | FAIR | $1,200 | $1,700 |
Concrete block | 1940 - 1959 | >=301m2 | POOR | $650 | $1,200 |
Concrete block | 1960 - 1999 | <=120m2 | AS NEW | $2,250 | $3,050 |
Concrete block | 1960 - 1999 | <=120m2 | GOOD | $1,850 | $2,500 |
Concrete block | 1960 - 1999 | <=120m2 | FAIR | $1,350 | $1,850 |
Concrete block | 1960 - 1999 | <=120m2 | POOR | $650 | $1,200 |
Concrete block | 1960 - 1999 | 121 - 200m2 | AS NEW | $2,200 | $3,000 |
Concrete block | 1960 - 1999 | 121 - 200m2 | GOOD | $1,800 | $2,450 |
Concrete block | 1960 - 1999 | 121 - 200m2 | FAIR | $1,300 | $1,800 |
Concrete block | 1960 - 1999 | 121 - 200m2 | POOR | $650 | $1,200 |
Concrete block | 1960 - 1999 | 201 - 300m2 | AS NEW | $2,200 | $3,000 |
Concrete block | 1960 - 1999 | 201 - 300m2 | GOOD | $1,800 | $2,450 |
Concrete block | 1960 - 1999 | 201 - 300m2 | FAIR | $1,300 | $1,800 |
Concrete block | 1960 - 1999 | 201 - 300m2 | POOR | $650 | $1,200 |
Concrete block | 1960 - 1999 | >=301m2 | AS NEW | $2,150 | $2,950 |
Concrete block | 1960 - 1999 | >=301m2 | GOOD | $1,750 | $2,400 |
Concrete block | 1960 - 1999 | >=301m2 | FAIR | $1,250 | $1,750 |
Concrete block | 1960 - 1999 | >=301m2 | POOR | $650 | $1,200 |
Concrete block | 2000 - current | <=120m2 | AS NEW | $2,300 | $3,100 |
Concrete block | 2000 - current | <=120m2 | GOOD | $1,800 | $2,450 |
Concrete block | 2000 - current | <=120m2 | FAIR | $1,300 | $1,800 |
Concrete block | 2000 - current | <=120m2 | POOR | $650 | $1,200 |
Concrete block | 2000 - current | 121 - 200m2 | AS NEW | $2,250 | $3,050 |
Concrete block | 2000 - current | 121 - 200m2 | GOOD | $1,750 | $2,400 |
Concrete block | 2000 - current | 121 - 200m2 | FAIR | $1,250 | $1,750 |
Concrete block | 2000 - current | 121 - 200m2 | POOR | $650 | $1,200 |
Concrete block | 2000 - current | 201 - 300m2 | AS NEW | $2,250 | $3,050 |
Concrete block | 2000 - current | 201 - 300m2 | GOOD | $1,750 | $2,400 |
Concrete block | 2000 - current | 201 - 300m2 | FAIR | $1,250 | $1,750 |
Concrete block | 2000 - current | 201 - 300m2 | POOR | $650 | $1,200 |
Concrete block | 2000 - current | >=301m2 | AS NEW | $2,200 | $3,000 |
Concrete block | 2000 - current | >=301m2 | GOOD | $1,700 | $2,350 |
Concrete block | 2000 - current | >=301m2 | FAIR | $1,200 | $1,700 |
Concrete block | 2000 - current | >=301m2 | POOR | $650 | $1,200 |
Double brick | Pre 1930 | <=120m2 | AS NEW | $2,150 | $2,950 |
Double brick | Pre 1930 | <=120m2 | GOOD | $1,750 | $2,400 |
Double brick | Pre 1930 | <=120m2 | FAIR | $1,250 | $1,750 |
Double brick | Pre 1930 | <=120m2 | POOR | $650 | $1,200 |
Double brick | Pre 1930 | 121 - 200m2 | AS NEW | $2,100 | $2,900 |
Double brick | Pre 1930 | 121 - 200m2 | GOOD | $1,700 | $2,350 |
Double brick | Pre 1930 | 121 - 200m2 | FAIR | $1,200 | $1,700 |
Double brick | Pre 1930 | 121 - 200m2 | POOR | $650 | $1,200 |
Double brick | Pre 1930 | 201 - 300m2 | AS NEW | $2,100 | $2,900 |
Double brick | Pre 1930 | 201 - 300m2 | GOOD | $1,700 | $2,350 |
Double brick | Pre 1930 | 201 - 300m2 | FAIR | $1,200 | $1,700 |
Double brick | Pre 1930 | 201 - 300m2 | POOR | $650 | $1,200 |
Double brick | Pre 1930 | >=301m2 | AS NEW | $2,050 | $2,850 |
Double brick | Pre 1930 | >=301m2 | GOOD | $1,650 | $2,300 |
Double brick | Pre 1930 | >=301m2 | FAIR | $1,150 | $1,650 |
Double brick | Pre 1930 | >=301m2 | POOR | $650 | $1,200 |
Double brick | 1930 - 1939 | <=120m2 | AS NEW | $2,200 | $3,000 |
Double brick | 1930 - 1939 | <=120m2 | GOOD | $1,800 | $2,450 |
Double brick | 1930 - 1939 | <=120m2 | FAIR | $1,300 | $1,800 |
Double brick | 1930 - 1939 | <=120m2 | POOR | $650 | $1,200 |
Double brick | 1930 - 1939 | 121 - 200m2 | AS NEW | $2,150 | $2,950 |
Double brick | 1930 - 1939 | 121 - 200m2 | GOOD | $1,750 | $2,400 |
Double brick | 1930 - 1939 | 121 - 200m2 | FAIR | $1,250 | $1,750 |
Double brick | 1930 - 1939 | 121 - 200m2 | POOR | $650 | $1,200 |
Double brick | 1930 - 1939 | 201 - 300m2 | AS NEW | $2,150 | $2,950 |
Double brick | 1930 - 1939 | 201 - 300m2 | GOOD | $1,750 | $2,400 |
Double brick | 1930 - 1939 | 201 - 300m2 | FAIR | $1,250 | $1,750 |
Double brick | 1930 - 1939 | 201 - 300m2 | POOR | $650 | $1,200 |
Double brick | 1930 - 1939 | >=301m2 | AS NEW | $2,100 | $2,900 |
Double brick | 1930 - 1939 | >=301m2 | GOOD | $1,700 | $2,350 |
Double brick | 1930 - 1939 | >=301m2 | FAIR | $1,200 | $1,700 |
Double brick | 1930 - 1939 | >=301m2 | POOR | $650 | $1,200 |
Double brick | 1940 - 1959 | <=120m2 | AS NEW | $2,200 | $3,000 |
Double brick | 1940 - 1959 | <=120m2 | GOOD | $1,800 | $2,450 |
Double brick | 1940 - 1959 | <=120m2 | FAIR | $1,300 | $1,800 |
Double brick | 1940 - 1959 | <=120m2 | POOR | $650 | $1,200 |
Double brick | 1940 - 1959 | 121 - 200m2 | AS NEW | $2,150 | $2,950 |
Double brick | 1940 - 1959 | 121 - 200m2 | GOOD | $1,750 | $2,400 |
Double brick | 1940 - 1959 | 121 - 200m2 | FAIR | $1,250 | $1,750 |
Double brick | 1940 - 1959 | 121 - 200m2 | POOR | $650 | $1,200 |
Double brick | 1940 - 1959 | 201 - 300m2 | AS NEW | $2,150 | $2,950 |
Double brick | 1940 - 1959 | 201 - 300m2 | GOOD | $1,750 | $2,400 |
Double brick | 1940 - 1959 | 201 - 300m2 | FAIR | $1,250 | $1,750 |
Double brick | 1940 - 1959 | 201 - 300m2 | POOR | $650 | $1,200 |
Double brick | 1940 - 1959 | >=301m2 | AS NEW | $2,100 | $2,900 |
Double brick | 1940 - 1959 | >=301m2 | GOOD | $1,700 | $2,350 |
Double brick | 1940 - 1959 | >=301m2 | FAIR | $1,200 | $1,700 |
Double brick | 1940 - 1959 | >=301m2 | POOR | $650 | $1,200 |
Double brick | 1960 - 1999 | <=120m2 | AS NEW | $2,250 | $3,050 |
Double brick | 1960 - 1999 | <=120m2 | GOOD | $1,850 | $2,500 |
Double brick | 1960 - 1999 | <=120m2 | FAIR | $1,350 | $1,850 |
Double brick | 1960 - 1999 | <=120m2 | POOR | $650 | $1,200 |
Double brick | 1960 - 1999 | 121 - 200m2 | AS NEW | $2,200 | $3,000 |
Double brick | 1960 - 1999 | 121 - 200m2 | GOOD | $1,800 | $2,450 |
Double brick | 1960 - 1999 | 121 - 200m2 | FAIR | $1,300 | $1,800 |
Double brick | 1960 - 1999 | 121 - 200m2 | POOR | $650 | $1,200 |
Double brick | 1960 - 1999 | 201 - 300m2 | AS NEW | $2,200 | $3,000 |
Double brick | 1960 - 1999 | 201 - 300m2 | GOOD | $1,800 | $2,450 |
Double brick | 1960 - 1999 | 201 - 300m2 | FAIR | $1,300 | $1,800 |
Double brick | 1960 - 1999 | 201 - 300m2 | POOR | $650 | $1,200 |
Double brick | 1960 - 1999 | >=301m2 | AS NEW | $2,150 | $2,950 |
Double brick | 1960 - 1999 | >=301m2 | GOOD | $1,750 | $2,400 |
Double brick | 1960 - 1999 | >=301m2 | FAIR | $1,250 | $1,750 |
Double brick | 1960 - 1999 | >=301m2 | POOR | $650 | $1,200 |
Double brick | 2000 - current | <=120m2 | AS NEW | $2,300 | $3,100 |
Double brick | 2000 - current | <=120m2 | GOOD | $1,800 | $2,450 |
Double brick | 2000 - current | <=120m2 | FAIR | $1,300 | $1,800 |
Double brick | 2000 - current | <=120m2 | POOR | $650 | $1,200 |
Double brick | 2000 - current | 121 - 200m2 | AS NEW | $2,250 | $3,050 |
Double brick | 2000 - current | 121 - 200m2 | GOOD | $1,750 | $2,400 |
Double brick | 2000 - current | 121 - 200m2 | FAIR | $1,250 | $1,750 |
Double brick | 2000 - current | 121 - 200m2 | POOR | $650 | $1,200 |
Double brick | 2000 - current | 201 - 300m2 | AS NEW | $2,250 | $3,050 |
Double brick | 2000 - current | 201 - 300m2 | GOOD | $1,750 | $2,400 |
Double brick | 2000 - current | 201 - 300m2 | FAIR | $1,250 | $1,750 |
Double brick | 2000 - current | 201 - 300m2 | POOR | $650 | $1,200 |
Double brick | 2000 - current | >=301m2 | AS NEW | $2,200 | $3,000 |
Double brick | 2000 - current | >=301m2 | GOOD | $1,700 | $2,350 |
Double brick | 2000 - current | >=301m2 | FAIR | $1,200 | $1,700 |
Double brick | 2000 - current | >=301m2 | POOR | $650 | $1,200 |
Fibrous cement | 1930 - 1939 | <=120m2 | AS NEW | $1,500 | $2,700 |
Fibrous cement | 1930 - 1939 | <=120m2 | GOOD | $1,150 | $1,800 |
Fibrous cement | 1930 - 1939 | <=120m2 | FAIR | $850 | $1,300 |
Fibrous cement | 1930 - 1939 | <=120m2 | POOR | $650 | $1,100 |
Fibrous cement | 1930 - 1939 | 121 - 200m2 | AS NEW | $1,500 | $2,700 |
Fibrous cement | 1930 - 1939 | 121 - 200m2 | GOOD | $1,150 | $1,800 |
Fibrous cement | 1930 - 1939 | 121 - 200m2 | FAIR | $850 | $1,300 |
Fibrous cement | 1930 - 1939 | 121 - 200m2 | POOR | $650 | $1,100 |
Fibrous cement | 1930 - 1939 | 201 - 300m2 | AS NEW | $1,500 | $2,700 |
Fibrous cement | 1930 - 1939 | 201 - 300m2 | GOOD | $1,150 | $1,800 |
Fibrous cement | 1930 - 1939 | 201 - 300m2 | FAIR | $850 | $1,300 |
Fibrous cement | 1930 - 1939 | 201 - 300m2 | POOR | $650 | $1,100 |
Fibrous cement | 1930 - 1939 | >=301m2 | AS NEW | $1,500 | $2,700 |
Fibrous cement | 1930 - 1939 | >=301m2 | GOOD | $1,150 | $1,800 |
Fibrous cement | 1930 - 1939 | >=301m2 | FAIR | $850 | $1,300 |
Fibrous cement | 1930 - 1939 | >=301m2 | POOR | $650 | $1,100 |
Fibrous cement | 1940 - 1959 | <=120m2 | AS NEW | $1,500 | $2,700 |
Fibrous cement | 1940 - 1959 | <=120m2 | GOOD | $1,150 | $1,800 |
Fibrous cement | 1940 - 1959 | <=120m2 | FAIR | $850 | $1,300 |
Fibrous cement | 1940 - 1959 | <=120m2 | POOR | $650 | $1,100 |
Fibrous cement | 1940 - 1959 | 121 - 200m2 | AS NEW | $1,500 | $2,700 |
Fibrous cement | 1940 - 1959 | 121 - 200m2 | GOOD | $1,150 | $1,800 |
Fibrous cement | 1940 - 1959 | 121 - 200m2 | FAIR | $850 | $1,300 |
Fibrous cement | 1940 - 1959 | 121 - 200m2 | POOR | $650 | $1,100 |
Fibrous cement | 1940 - 1959 | 201 - 300m2 | AS NEW | $1,500 | $2,700 |
Fibrous cement | 1940 - 1959 | 201 - 300m2 | GOOD | $1,150 | $1,800 |
Fibrous cement | 1940 - 1959 | 201 - 300m2 | FAIR | $850 | $1,300 |
Fibrous cement | 1940 - 1959 | 201 - 300m2 | POOR | $650 | $1,100 |
Fibrous cement | 1940 - 1959 | >=301m2 | AS NEW | $1,500 | $2,700 |
Fibrous cement | 1940 - 1959 | >=301m2 | GOOD | $1,150 | $1,800 |
Fibrous cement | 1940 - 1959 | >=301m2 | FAIR | $850 | $1,300 |
Fibrous cement | 1940 - 1959 | >=301m2 | POOR | $650 | $1,100 |
Fibrous cement | 1960 - 1999 | <=120m2 | AS NEW | $1,500 | $2,700 |
Fibrous cement | 1960 - 1999 | <=120m2 | GOOD | $1,150 | $1,800 |
Fibrous cement | 1960 - 1999 | <=120m2 | FAIR | $850 | $1,300 |
Fibrous cement | 1960 - 1999 | <=120m2 | POOR | $650 | $1,100 |
Fibrous cement | 1960 - 1999 | 121 - 200m2 | AS NEW | $1,500 | $2,700 |
Fibrous cement | 1960 - 1999 | 121 - 200m2 | GOOD | $1,150 | $1,800 |
Fibrous cement | 1960 - 1999 | 121 - 200m2 | FAIR | $850 | $1,300 |
Fibrous cement | 1960 - 1999 | 121 - 200m2 | POOR | $650 | $1,100 |
Fibrous cement | 1960 - 1999 | 201 - 300m2 | AS NEW | $1,500 | $2,700 |
Fibrous cement | 1960 - 1999 | 201 - 300m2 | GOOD | $1,150 | $1,800 |
Fibrous cement | 1960 - 1999 | 201 - 300m2 | FAIR | $850 | $1,300 |
Fibrous cement | 1960 - 1999 | 201 - 300m2 | POOR | $650 | $1,100 |
Fibrous cement | 1960 - 1999 | >=301m2 | AS NEW | $1,500 | $2,700 |
Fibrous cement | 1960 - 1999 | >=301m2 | GOOD | $1,150 | $1,800 |
Fibrous cement | 1960 - 1999 | >=301m2 | FAIR | $850 | $1,300 |
Fibrous cement | 1960 - 1999 | >=301m2 | POOR | $650 | $1,100 |
Fibrous cement | 2000 - current | <=120m2 | AS NEW | $1,500 | $2,700 |
Fibrous cement | 2000 - current | <=120m2 | GOOD | $1,150 | $1,800 |
Fibrous cement | 2000 - current | <=120m2 | FAIR | $850 | $1,300 |
Fibrous cement | 2000 - current | <=120m2 | POOR | $650 | $1,100 |
Fibrous cement | 2000 - current | 121 - 200m2 | AS NEW | $1,500 | $2,700 |
Fibrous cement | 2000 - current | 121 - 200m2 | GOOD | $1,150 | $1,800 |
Fibrous cement | 2000 - current | 121 - 200m2 | FAIR | $850 | $1,300 |
Fibrous cement | 2000 - current | 121 - 200m2 | POOR | $650 | $1,100 |
Fibrous cement | 2000 - current | 201 - 300m2 | AS NEW | $1,500 | $2,700 |
Fibrous cement | 2000 - current | 201 - 300m2 | GOOD | $1,150 | $1,800 |
Fibrous cement | 2000 - current | 201 - 300m2 | FAIR | $850 | $1,300 |
Fibrous cement | 2000 - current | 201 - 300m2 | POOR | $650 | $1,100 |
Fibrous cement | 2000 - current | >=301m2 | AS NEW | $1,500 | $2,700 |
Fibrous cement | 2000 - current | >=301m2 | GOOD | $1,150 | $1,800 |
Fibrous cement | 2000 - current | >=301m2 | FAIR | $850 | $1,300 |
Fibrous cement | 2000 - current | >=301m2 | POOR | $650 | $1,100 |
Prestige architectural designed | 1960 - 1999 | <=120m2 | AS NEW | $1,750 | $5,000 |
Prestige architectural designed | 1960 - 1999 | <=120m2 | GOOD | $1,750 | $3,500 |
Prestige architectural designed | 1960 - 1999 | 121 - 200m2 | AS NEW | $1,750 | $5,000 |
Prestige architectural designed | 1960 - 1999 | 121 - 200m2 | GOOD | $1,750 | $3,500 |
Prestige architectural designed | 1960 - 1999 | 201 - 300m2 | AS NEW | $1,750 | $5,000 |
Prestige architectural designed | 1960 - 1999 | 201 - 300m2 | GOOD | $1,750 | $3,500 |
Prestige architectural designed | 1960 - 1999 | >=301m2 | AS NEW | $1,750 | $5,000 |
Prestige architectural designed | 1960 - 1999 | >=301m2 | GOOD | $1,750 | $3,500 |
Prestige architectural designed | 2000 - current | <=120m2 | AS NEW | $1,750 | $5,000 |
Prestige architectural designed | 2000 - current | <=120m2 | GOOD | $1,750 | $3,500 |
Prestige architectural designed | 2000 - current | 121 - 200m2 | AS NEW | $1,750 | $5,000 |
Prestige architectural designed | 2000 - current | 121 - 200m2 | GOOD | $1,750 | $3,500 |
Prestige architectural designed | 2000 - current | 201 - 300m2 | AS NEW | $1,750 | $5,000 |
Prestige architectural designed | 2000 - current | 201 - 300m2 | GOOD | $1,750 | $3,500 |
Prestige architectural designed | 2000 - current | >=301m2 | AS NEW | $1,750 | $5,000 |
Prestige architectural designed | 2000 - current | >=301m2 | GOOD | $1,750 | $3,500 |
Rendered brick | Pre 1930 | <=120m2 | AS NEW | $2,150 | $2,950 |
Rendered brick | Pre 1930 | <=120m2 | GOOD | $1,750 | $2,400 |
Rendered brick | Pre 1930 | <=120m2 | FAIR | $1,250 | $1,750 |
Rendered brick | Pre 1930 | <=120m2 | POOR | $650 | $1,200 |
Rendered brick | Pre 1930 | 121 - 200m2 | AS NEW | $2,100 | $2,900 |
Rendered brick | Pre 1930 | 121 - 200m2 | GOOD | $1,700 | $2,350 |
Rendered brick | Pre 1930 | 121 - 200m2 | FAIR | $1,200 | $1,700 |
Rendered brick | Pre 1930 | 121 - 200m2 | POOR | $650 | $1,200 |
Rendered brick | Pre 1930 | 201 - 300m2 | AS NEW | $2,100 | $2,900 |
Rendered brick | Pre 1930 | 201 - 300m2 | GOOD | $1,700 | $2,350 |
Rendered brick | Pre 1930 | 201 - 300m2 | FAIR | $1,200 | $1,700 |
Rendered brick | Pre 1930 | 201 - 300m2 | POOR | $650 | $1,200 |
Rendered brick | Pre 1930 | >=301m2 | AS NEW | $2,050 | $2,850 |
Rendered brick | Pre 1930 | >=301m2 | GOOD | $1,650 | $2,300 |
Rendered brick | Pre 1930 | >=301m2 | FAIR | $1,150 | $1,650 |
Rendered brick | Pre 1930 | >=301m2 | POOR | $650 | $1,200 |
Rendered brick | 1930 - 1939 | <=120m2 | AS NEW | $2,200 | $3,000 |
Rendered brick | 1930 - 1939 | <=120m2 | GOOD | $1,800 | $2,450 |
Rendered brick | 1930 - 1939 | <=120m2 | FAIR | $1,300 | $1,800 |
Rendered brick | 1930 - 1939 | <=120m2 | POOR | $650 | $1,200 |
Rendered brick | 1930 - 1939 | 121 - 200m2 | AS NEW | $2,150 | $2,950 |
Rendered brick | 1930 - 1939 | 121 - 200m2 | GOOD | $1,750 | $2,400 |
Rendered brick | 1930 - 1939 | 121 - 200m2 | FAIR | $1,250 | $1,750 |
Rendered brick | 1930 - 1939 | 121 - 200m2 | POOR | $650 | $1,200 |
Rendered brick | 1930 - 1939 | 201 - 300m2 | AS NEW | $2,150 | $2,950 |
Rendered brick | 1930 - 1939 | 201 - 300m2 | GOOD | $1,750 | $2,400 |
Rendered brick | 1930 - 1939 | 201 - 300m2 | FAIR | $1,250 | $1,750 |
Rendered brick | 1930 - 1939 | 201 - 300m2 | POOR | $650 | $1,200 |
Rendered brick | 1930 - 1939 | >=301m2 | AS NEW | $2,100 | $2,900 |
Rendered brick | 1930 - 1939 | >=301m2 | GOOD | $1,700 | $2,350 |
Rendered brick | 1930 - 1939 | >=301m2 | FAIR | $1,200 | $1,700 |
Rendered brick | 1930 - 1939 | >=301m2 | POOR | $650 | $1,200 |
Rendered brick | 1940 - 1959 | <=120m2 | AS NEW | $2,200 | $3,000 |
Rendered brick | 1940 - 1959 | <=120m2 | GOOD | $1,800 | $2,450 |
Rendered brick | 1940 - 1959 | <=120m2 | FAIR | $1,300 | $1,800 |
Rendered brick | 1940 - 1959 | <=120m2 | POOR | $650 | $1,200 |
Rendered brick | 1940 - 1959 | 121 - 200m2 | AS NEW | $2,150 | $2,950 |
Rendered brick | 1940 - 1959 | 121 - 200m2 | GOOD | $1,750 | $2,400 |
Rendered brick | 1940 - 1959 | 121 - 200m2 | FAIR | $1,250 | $1,750 |
Rendered brick | 1940 - 1959 | 121 - 200m2 | POOR | $650 | $1,200 |
Rendered brick | 1940 - 1959 | 201 - 300m2 | AS NEW | $2,150 | $2,950 |
Rendered brick | 1940 - 1959 | 201 - 300m2 | GOOD | $1,750 | $2,400 |
Rendered brick | 1940 - 1959 | 201 - 300m2 | FAIR | $1,250 | $1,750 |
Rendered brick | 1940 - 1959 | 201 - 300m2 | POOR | $650 | $1,200 |
Rendered brick | 1940 - 1959 | >=301m2 | AS NEW | $2,100 | $2,900 |
Rendered brick | 1940 - 1959 | >=301m2 | GOOD | $1,700 | $2,350 |
Rendered brick | 1940 - 1959 | >=301m2 | FAIR | $1,200 | $1,700 |
Rendered brick | 1940 - 1959 | >=301m2 | POOR | $650 | $1,200 |
Rendered brick | 1960 - 1999 | <=120m2 | AS NEW | $2,250 | $3,050 |
Rendered brick | 1960 - 1999 | <=120m2 | GOOD | $1,850 | $2,500 |
Rendered brick | 1960 - 1999 | <=120m2 | FAIR | $1,350 | $1,850 |
Rendered brick | 1960 - 1999 | <=120m2 | POOR | $650 | $1,200 |
Rendered brick | 1960 - 1999 | 121 - 200m2 | AS NEW | $2,200 | $3,000 |
Rendered brick | 1960 - 1999 | 121 - 200m2 | GOOD | $1,800 | $2,450 |
Rendered brick | 1960 - 1999 | 121 - 200m2 | FAIR | $1,300 | $1,800 |
Rendered brick | 1960 - 1999 | 121 - 200m2 | POOR | $650 | $1,200 |
Rendered brick | 1960 - 1999 | 201 - 300m2 | AS NEW | $2,200 | $3,000 |
Rendered brick | 1960 - 1999 | 201 - 300m2 | GOOD | $1,800 | $2,450 |
Rendered brick | 1960 - 1999 | 201 - 300m2 | FAIR | $1,300 | $1,800 |
Rendered brick | 1960 - 1999 | 201 - 300m2 | POOR | $650 | $1,200 |
Rendered brick | 1960 - 1999 | >=301m2 | AS NEW | $2,150 | $2,950 |
Rendered brick | 1960 - 1999 | >=301m2 | GOOD | $1,750 | $2,400 |
Rendered brick | 1960 - 1999 | >=301m2 | FAIR | $1,250 | $1,750 |
Rendered brick | 1960 - 1999 | >=301m2 | POOR | $650 | $1,200 |
Rendered brick | 2000 - current | <=120m2 | AS NEW | $2,300 | $3,100 |
Rendered brick | 2000 - current | <=120m2 | GOOD | $1,800 | $2,450 |
Rendered brick | 2000 - current | <=120m2 | FAIR | $1,300 | $1,800 |
Rendered brick | 2000 - current | <=120m2 | POOR | $650 | $1,200 |
Rendered brick | 2000 - current | 121 - 200m2 | AS NEW | $2,250 | $3,050 |
Rendered brick | 2000 - current | 121 - 200m2 | GOOD | $1,750 | $2,400 |
Rendered brick | 2000 - current | 121 - 200m2 | FAIR | $1,250 | $1,750 |
Rendered brick | 2000 - current | 121 - 200m2 | POOR | $650 | $1,200 |
Rendered brick | 2000 - current | 201 - 300m2 | AS NEW | $2,250 | $3,050 |
Rendered brick | 2000 - current | 201 - 300m2 | GOOD | $1,750 | $2,400 |
Rendered brick | 2000 - current | 201 - 300m2 | FAIR | $1,250 | $1,750 |
Rendered brick | 2000 - current | 201 - 300m2 | POOR | $650 | $1,200 |
Rendered brick | 2000 - current | >=301m2 | AS NEW | $2,200 | $3,000 |
Rendered brick | 2000 - current | >=301m2 | GOOD | $1,700 | $2,350 |
Rendered brick | 2000 - current | >=301m2 | FAIR | $1,200 | $1,700 |
Rendered brick | 2000 - current | >=301m2 | POOR | $650 | $1,200 |
Weatherboard | 1930 - 1939 | <=120m2 | AS NEW | $1,500 | $2,700 |
Weatherboard | 1930 - 1939 | <=120m2 | GOOD | $1,150 | $1,800 |
Weatherboard | 1930 - 1939 | <=120m2 | FAIR | $850 | $1,300 |
Weatherboard | 1930 - 1939 | <=120m2 | POOR | $650 | $1,100 |
Weatherboard | 1930 - 1939 | 121 - 200m2 | AS NEW | $1,500 | $2,700 |
Weatherboard | 1930 - 1939 | 121 - 200m2 | GOOD | $1,150 | $1,800 |
Weatherboard | 1930 - 1939 | 121 - 200m2 | FAIR | $850 | $1,300 |
Weatherboard | 1930 - 1939 | 121 - 200m2 | POOR | $650 | $1,100 |
Weatherboard | 1930 - 1939 | 201 - 300m2 | AS NEW | $1,500 | $2,700 |
Weatherboard | 1930 - 1939 | 201 - 300m2 | GOOD | $1,150 | $1,800 |
Weatherboard | 1930 - 1939 | 201 - 300m2 | FAIR | $850 | $1,300 |
Weatherboard | 1930 - 1939 | 201 - 300m2 | POOR | $650 | $1,100 |
Weatherboard | 1930 - 1939 | >=301m2 | AS NEW | $1,500 | $2,700 |
Weatherboard | 1930 - 1939 | >=301m2 | GOOD | $1,150 | $1,800 |
Weatherboard | 1930 - 1939 | >=301m2 | FAIR | $850 | $1,300 |
Weatherboard | 1930 - 1939 | >=301m2 | POOR | $650 | $1,100 |
Weatherboard | 1940 - 1959 | <=120m2 | AS NEW | $1,500 | $2,700 |
Weatherboard | 1940 - 1959 | <=120m2 | GOOD | $1,150 | $1,800 |
Weatherboard | 1940 - 1959 | <=120m2 | FAIR | $850 | $1,300 |
Weatherboard | 1940 - 1959 | <=120m2 | POOR | $650 | $1,100 |
Weatherboard | 1940 - 1959 | 121 - 200m2 | AS NEW | $1,500 | $2,700 |
Weatherboard | 1940 - 1959 | 121 - 200m2 | GOOD | $1,150 | $1,800 |
Weatherboard | 1940 - 1959 | 121 - 200m2 | FAIR | $850 | $1,300 |
Weatherboard | 1940 - 1959 | 121 - 200m2 | POOR | $650 | $1,100 |
Weatherboard | 1940 - 1959 | 201 - 300m2 | AS NEW | $1,500 | $2,700 |
Weatherboard | 1940 - 1959 | 201 - 300m2 | GOOD | $1,150 | $1,800 |
Weatherboard | 1940 - 1959 | 201 - 300m2 | FAIR | $850 | $1,300 |
Weatherboard | 1940 - 1959 | 201 - 300m2 | POOR | $650 | $1,100 |
Weatherboard | 1940 - 1959 | >=301m2 | AS NEW | $1,500 | $2,700 |
Weatherboard | 1940 - 1959 | >=301m2 | GOOD | $1,150 | $1,800 |
Weatherboard | 1940 - 1959 | >=301m2 | FAIR | $850 | $1,300 |
Weatherboard | 1940 - 1959 | >=301m2 | POOR | $650 | $1,100 |
Weatherboard | 1960 - 1999 | <=120m2 | AS NEW | $1,500 | $2,700 |
Weatherboard | 1960 - 1999 | <=120m2 | GOOD | $1,150 | $1,800 |
Weatherboard | 1960 - 1999 | <=120m2 | FAIR | $850 | $1,300 |
Weatherboard | 1960 - 1999 | <=120m2 | POOR | $650 | $1,100 |
Weatherboard | 1960 - 1999 | 121 - 200m2 | AS NEW | $1,500 | $2,700 |
Weatherboard | 1960 - 1999 | 121 - 200m2 | GOOD | $1,150 | $1,800 |
Weatherboard | 1960 - 1999 | 121 - 200m2 | FAIR | $850 | $1,300 |
Weatherboard | 1960 - 1999 | 121 - 200m2 | POOR | $650 | $1,100 |
Weatherboard | 1960 - 1999 | 201 - 300m2 | AS NEW | $1,500 | $2,700 |
Weatherboard | 1960 - 1999 | 201 - 300m2 | GOOD | $1,150 | $1,800 |
Weatherboard | 1960 - 1999 | 201 - 300m2 | FAIR | $850 | $1,300 |
Weatherboard | 1960 - 1999 | 201 - 300m2 | POOR | $650 | $1,100 |
Weatherboard | 1960 - 1999 | >=301m2 | AS NEW | $1,500 | $2,700 |
Weatherboard | 1960 - 1999 | >=301m2 | GOOD | $1,150 | $1,800 |
Weatherboard | 1960 - 1999 | >=301m2 | FAIR | $850 | $1,300 |
Weatherboard | 1960 - 1999 | >=301m2 | POOR | $650 | $1,100 |
Weatherboard | 2000 - current | <=120m2 | AS NEW | $1,500 | $2,700 |
Weatherboard | 2000 - current | <=120m2 | GOOD | $1,150 | $1,800 |
Weatherboard | 2000 - current | <=120m2 | FAIR | $850 | $1,300 |
Weatherboard | 2000 - current | <=120m2 | POOR | $650 | $1,100 |
Weatherboard | 2000 - current | 121 - 200m2 | AS NEW | $1,500 | $2,700 |
Weatherboard | 2000 - current | 121 - 200m2 | GOOD | $1,150 | $1,800 |
Weatherboard | 2000 - current | 121 - 200m2 | FAIR | $850 | $1,300 |
Weatherboard | 2000 - current | 121 - 200m2 | POOR | $650 | $1,100 |
Weatherboard | 2000 - current | 201 - 300m2 | AS NEW | $1,500 | $2,700 |
Weatherboard | 2000 - current | 201 - 300m2 | GOOD | $1,150 | $1,800 |
Weatherboard | 2000 - current | 201 - 300m2 | FAIR | $850 | $1,300 |
Weatherboard | 2000 - current | 201 - 300m2 | POOR | $650 | $1,100 |
Weatherboard | 2000 - current | >=301m2 | AS NEW | $1,500 | $2,700 |
Weatherboard | 2000 - current | >=301m2 | GOOD | $1,150 | $1,800 |
Weatherboard | 2000 - current | >=301m2 | FAIR | $850 | $1,300 |
Weatherboard | 2000 - current | >=301m2 | POOR | $650 | $1,100 |