This page provides an overview of land values in each local government area. Select a valuing year and local government area and click 'Go' to continue.

General overview

Overall land values have shown a very strong increase in the City of Parramatta local government area between July 2021 and July 2022. Increases in land values were consistent across all market segments. Residential, commercial and industrial land values all increased very strongly, although at differing rates.

Construction work continues to progress on the Parramatta Light Rail (Stage 1), which will connect Westmead to Carlingford via Parramatta CBD and Camellia. The light rail track installation is almost complete across the 12-kilometre alignment from Westmead to Carlingford. Passenger services for this stage are expected to commence in late 2023.

The NSW Government recently committed $602.4 million to proceed with Parramatta Light Rail Stage 2. Stage 2 of the Parramatta Light Rail will connect Stage 1 and Parramatta's CBD to Sydney Olympic Park via Camellia, Rydalmere, Ermington, Melrose Park and Wentworth Point. It will link communities north and south of the Parramatta River directly to the Parramatta CBD, the Camellia Town Centre, as well as the sport, entertainment, education and employment hub at Sydney Olympic Park, and to the Carter Street Precinct. The planning and development work for Stage 2 of the Parramatta Light Rail is underway, focused on enabling works for the delivery of a new bridge connection between Wentworth Point and Melrose Park. Construction of the bridge is expected to commence in 2024.

The Sydney Metro West project, part of the Sydney Metro underground railway, will double rail capacity between Greater Parramatta and the Sydney CBD. The project includes a Parramatta CBD Metro Station which has progressed from planning stage to start of construction and site establishment works, which are now underway on the block bounded by George, Macquarie, Church and Smith streets just north of the existing Parramatta Station.

Land value trends

Property zone 01 Jul 2021 01 Jul 2022 % change
Residential $60,846,059,355 $76,883,317,149  26.4%
Commercial $3,400,335,430 $4,575,052,600  34.6%
Industrial $4,605,852,151 $7,202,886,150  56.4%
Other $1,337,815,040 $1,498,355,340  12.0%
Total $70,190,061,976 $90,159,611,239  28.5%

Number of properties by zone

Total number of properties: 48,919

 Residential land values

Residential overview

Residential land values have increased very strongly overall in the local government area between July 2021 and July 2022. However, larger sized high density residential sites as well as sites surrounding Sydney Olympic Park and mixed-use zoned properties at Old Toongabbie, Toongabbie and Wentworthville showed only moderate increases overall.

Infrastructure improvements are positive drivers including rail projects such as the Parramatta Light Rail which will connect Westmead to Carlingford via the Parramatta CBD and the underground Sydney Metro West project, which will connect Parramatta to the Sydney CBD via North Strathfield, North Burwood and Five Dock and will provide greater flexibility for travelling commuters. The WestConnex road project, has also improved access to Inner city suburbs and Sydney City with reduced travel times.


Median land values and sale prices


The above chart shows movement in the property market and land values over a five year period. In areas where there are a low number of sales, median sale prices may not accurately reflect the property market. Land values may not always move directly in line with sale prices due to the influence of other factors, such as building costs.

Typical residential land values

Address 01 Jul 2021 01 Jul 2022 % change
Marwood Dr, Beecroft $1,350,000 $1,740,000  28.9%
Boundary Rd, Carlingford $2,400,000 $3,300,000  37.5%
Bradley Dr, Carlingford $1,160,000 $1,550,000  33.6%
Honiton Ave, Carlingford $1,140,000 $1,400,000  22.8%
Murray Farm Rd, Carlingford $179,000 $214,000  19.6%
Tomah St, Carlingford $1,670,000 $2,010,000  20.4%
Mahony Rd, Constitution Hill $2,400,000 $2,800,000  16.7%
Norris Way, Constitution Hill $430,000 $500,000  16.3%
Robbs Pl, Dundas Valley $973,000 $1,200,000  23.3%
Albuera Rd, Epping $1,530,000 $1,910,000  24.8%
Dawson St, Epping $1,450,000 $1,900,000  31.0%
Ferntree Pl, Epping $950,000 $1,140,000  20.0%
Hillside Cres, Epping $3,600,000 $3,950,000  9.7%
Macartney St, Ermington $1,060,000 $1,430,000  34.9%
Mcardle St, Ermington $2,650,000 $3,200,000  20.8%
Stevens St, Ermington $970,000 $1,230,000  26.8%
Cowper St, Granville $1,000,000 $1,550,000  55.0%
Wigram St, Harris Park $2,540,000 $3,240,000  27.6%
Flock St, Lidcombe $19,300,000 $21,000,000  8.8%
Beaurepaire Ave, Newington $1,000,000 $1,280,000  28.0%
Brickfield St, North Parramatta $2,150,000 $2,400,000  11.6%
Gilbert St, North Parramatta $910,000 $1,130,000  24.2%
Gladstone St, North Parramatta $990,000 $1,310,000  32.3%
Davidson Ave, North Rocks $1,020,000 $1,360,000  33.3%
Howard Ave, Northmead $3,250,000 $3,600,000  10.8%
Rifle Range Rd, Northmead $9,740,000 $11,000,000  12.9%
Wandella Ave, Northmead $880,000 $1,200,000  36.4%
Gollan Ave, Oatlands $1,330,000 $1,920,000  44.4%
Aird St, Parramatta $6,850,000 $7,920,000  15.6%
Church St, Parramatta $1,200,000 $1,800,000  50.0%
Hunter St, Parramatta $2,200,000 $3,300,000  50.0%
Marsden St, Parramatta $14,300,000 $15,500,000  8.4%
James Ruse Dr, Rosehill $15,000,000 $17,500,000  16.7%
Prospect St, Rosehill $2,010,000 $2,300,000  14.4%
Park Rd, Rydalmere $2,390,000 $2,750,000  15.1%
Carnarvon St, Silverwater $2,390,000 $2,850,000  19.3%
Showground Rd, Sydney Olympic Park $3,710,000 $4,100,000  10.5%
Marshall Rd, Telopea $1,050,000 $1,400,000  33.3%
Derbyshire Ave, Toongabbie $720,000 $910,000  26.4%
Greenmeadows Cres, Toongabbie $715,000 $900,000  25.9%
Premier St, Toongabbie $720,000 $930,000  29.2%
Stromboli Strait , Wentworth Point $10,900,000 $12,000,000  10.1%
Railway St, Wentworthville $1,490,000 $1,600,000  7.4%
Central Ave, Westmead $3,500,000 $3,700,000  5.7%
Marconi St, Winston Hills $780,000 $1,030,000  32.1%

Commercial overview

The land values for commercial properties showed very strong increases overall between July 2021 and July 2022. Sales volumes and sale prices compared to the prior year reflected continued positive market sentiment and hence a continuation of increasing land values to this sector.

Overall, very strong increases within the Commercial zones reflect the unprecedented growth and infrastructure improvements to the Parramatta CBD and immediate surrounds such as the Parramatta Light Rail project.

Very strong increases to the Commercial Core zone within the Parramatta CBD are attributed to increased densities under recently gazetted CBD planning proposal to Parramatta Local Environmental Plan 2011.


Typical commercial land values

Address 01 Jul 2021 01 Jul 2022 % change
Pennant Hills Rd, Carlingford $1,650,000 $2,000,000  21.2%
Oxford St, Epping $1,870,000 $2,200,000  17.7%
Bridge St, Granville $560,000 $746,000  33.2%
Church St, Granville $2,630,000 $3,900,000  48.3%
Parramatta Rd, Granville $1,400,000 $2,100,000  50.0%
Wigram St, Harris Park $700,000 $950,000  35.7%
Carter St, Lidcombe $8,100,000 $10,100,000  24.7%
Avenue Of Europe , Newington $1,730,000 $2,000,000  15.6%
Holker St, Newington $6,400,000 $9,000,000  40.6%
O'Connell St, North Parramatta $1,190,000 $1,490,000  25.2%
Church St, Parramatta $5,140,000 $8,000,000  55.6%
Wentworth St, Parramatta $5,610,000 $8,970,000  59.9%
Beaconsfield St, Silverwater $708,000 $925,000  30.7%
Ancona Ave, Toongabbie $2,190,000 $2,500,000  14.2%
Burroway Rd, Wentworth Point $8,500,000 $10,000,000  17.7%
Caroline Chisholm Dr, Winston Hills $442,000 $510,000  15.4%

Industrial overview

Industrial land values have increased very strongly overall from July 2021 to July 2022.This is due to continued demand for industrial sites by owner-occupiers and institutional investors, particularly for large sites (over 1-hectare) for future redevelopment or use within the strong performing sectors of logistics, e-commerce and large data centres. The strong increases being supported by robust sale volumes across the district’s many industrial precincts.

Sales within the Heavy Industrial zone of Camellia/Rosehill showed very strong demand for sites, due to its ideal location. The precinct is also set to directly benefit several planning initiatives and infrastructure projects like the Parramatta Light Rail (Stage 2) and the recently exhibited draft Camellia-Rosehill Place Strategy related to the proposed draft Camellia/Rosehill Town Centre Master Plan.


Typical industrial land values

Address 01 Jul 2021 01 Jul 2022 % change
Thackeray St, Camellia $6,200,000 $10,500,000  69.4%
George St, Clyde $1,350,000 $1,900,000  40.7%
Hope St, Melrose Park $3,180,000 $5,100,000  60.4%
Grose St, North Parramatta $1,380,000 $2,000,000  44.9%
Lenton Pl, North Rocks $4,000,000 $6,000,000  50.0%
Briens Rd, Northmead $18,200,000 $27,000,000  48.4%
James Ruse Dr, Parramatta $57,400 $68,800  19.9%
Bridge St, Rydalmere $970,000 $1,450,000  49.5%
Egerton St, Silverwater $7,940,000 $11,000,000  38.5%
Fisher St, Silverwater $1,495,000 $2,200,000  47.2%
Wetherill St, Silverwater $2,480,000 $3,600,000  45.2%

The added value of improvement tables show dollar values per square metre for the added value of improvements for the main residential property types in a local government area. It is the value the improvements add to the value of the land as demonstrated by the analysis of property sales.


Added value of improvement

Construction
/Style
Age Size Condition Lower
Value
Higher
Value
Brick Veneer Pre 1930 <=120m2 AS NEW $2,050 $2,850
Brick Veneer Pre 1930 <=120m2 GOOD $1,650 $2,200
Brick Veneer Pre 1930 <=120m2 FAIR $1,100 $1,600
Brick Veneer Pre 1930 <=120m2 POOR $650 $1,200
Brick Veneer Pre 1930 121 - 200m2 AS NEW $2,000 $2,800
Brick Veneer Pre 1930 121 - 200m2 GOOD $1,600 $2,150
Brick Veneer Pre 1930 121 - 200m2 FAIR $1,050 $1,550
Brick Veneer Pre 1930 121 - 200m2 POOR $650 $1,200
Brick Veneer Pre 1930 201 - 300m2 AS NEW $2,000 $2,800
Brick Veneer Pre 1930 201 - 300m2 GOOD $1,600 $2,150
Brick Veneer Pre 1930 201 - 300m2 FAIR $1,050 $1,550
Brick Veneer Pre 1930 201 - 300m2 POOR $650 $1,200
Brick Veneer Pre 1930 >=301m2 AS NEW $1,950 $2,750
Brick Veneer Pre 1930 >=301m2 GOOD $1,550 $2,100
Brick Veneer Pre 1930 >=301m2 FAIR $1,000 $1,500
Brick Veneer Pre 1930 >=301m2 POOR $650 $1,200
Brick Veneer 1930 - 1939 <=120m2 AS NEW $2,050 $2,850
Brick Veneer 1930 - 1939 <=120m2 GOOD $1,650 $2,200
Brick Veneer 1930 - 1939 <=120m2 FAIR $1,100 $1,600
Brick Veneer 1930 - 1939 <=120m2 POOR $650 $1,200
Brick Veneer 1930 - 1939 121 - 200m2 AS NEW $2,000 $2,800
Brick Veneer 1930 - 1939 121 - 200m2 GOOD $1,600 $2,150
Brick Veneer 1930 - 1939 121 - 200m2 FAIR $1,050 $1,550
Brick Veneer 1930 - 1939 121 - 200m2 POOR $650 $1,200
Brick Veneer 1930 - 1939 201 - 300m2 AS NEW $2,000 $2,800
Brick Veneer 1930 - 1939 201 - 300m2 GOOD $1,600 $2,150
Brick Veneer 1930 - 1939 201 - 300m2 FAIR $1,050 $1,550
Brick Veneer 1930 - 1939 201 - 300m2 POOR $650 $1,200
Brick Veneer 1930 - 1939 >=301m2 AS NEW $1,950 $2,750
Brick Veneer 1930 - 1939 >=301m2 GOOD $1,550 $2,100
Brick Veneer 1930 - 1939 >=301m2 FAIR $1,000 $1,500
Brick Veneer 1930 - 1939 >=301m2 POOR $650 $1,200
Brick Veneer 1940 - 1959 <=120m2 AS NEW $2,050 $2,850
Brick Veneer 1940 - 1959 <=120m2 GOOD $1,650 $2,200
Brick Veneer 1940 - 1959 <=120m2 FAIR $1,100 $1,600
Brick Veneer 1940 - 1959 <=120m2 POOR $650 $1,200
Brick Veneer 1940 - 1959 121 - 200m2 AS NEW $2,000 $2,800
Brick Veneer 1940 - 1959 121 - 200m2 GOOD $1,600 $2,150
Brick Veneer 1940 - 1959 121 - 200m2 FAIR $1,050 $1,550
Brick Veneer 1940 - 1959 121 - 200m2 POOR $650 $1,200
Brick Veneer 1940 - 1959 201 - 300m2 AS NEW $2,000 $2,800
Brick Veneer 1940 - 1959 201 - 300m2 GOOD $1,600 $2,150
Brick Veneer 1940 - 1959 201 - 300m2 FAIR $1,050 $1,550
Brick Veneer 1940 - 1959 201 - 300m2 POOR $650 $1,200
Brick Veneer 1940 - 1959 >=301m2 AS NEW $1,950 $2,750
Brick Veneer 1940 - 1959 >=301m2 GOOD $1,550 $2,100
Brick Veneer 1940 - 1959 >=301m2 FAIR $1,000 $1,500
Brick Veneer 1940 - 1959 >=301m2 POOR $650 $1,200
Brick Veneer 1960 - 1999 <=120m2 AS NEW $2,100 $2,900
Brick Veneer 1960 - 1999 <=120m2 GOOD $1,600 $2,250
Brick Veneer 1960 - 1999 <=120m2 FAIR $1,150 $1,600
Brick Veneer 1960 - 1999 <=120m2 POOR $650 $1,200
Brick Veneer 1960 - 1999 121 - 200m2 AS NEW $2,050 $2,850
Brick Veneer 1960 - 1999 121 - 200m2 GOOD $1,550 $2,200
Brick Veneer 1960 - 1999 121 - 200m2 FAIR $1,100 $1,550
Brick Veneer 1960 - 1999 121 - 200m2 POOR $650 $1,200
Brick Veneer 1960 - 1999 201 - 300m2 AS NEW $2,050 $2,850
Brick Veneer 1960 - 1999 201 - 300m2 GOOD $1,600 $2,200
Brick Veneer 1960 - 1999 201 - 300m2 FAIR $1,100 $1,550
Brick Veneer 1960 - 1999 201 - 300m2 POOR $650 $1,200
Brick Veneer 1960 - 1999 >=301m2 AS NEW $2,000 $2,800
Brick Veneer 1960 - 1999 >=301m2 GOOD $1,550 $2,150
Brick Veneer 1960 - 1999 >=301m2 FAIR $1,050 $1,550
Brick Veneer 1960 - 1999 >=301m2 POOR $650 $1,200
Brick Veneer 2000 - current <=120m2 AS NEW $2,200 $3,000
Brick Veneer 2000 - current <=120m2 GOOD $1,700 $2,300
Brick Veneer 2000 - current <=120m2 FAIR $1,200 $1,750
Brick Veneer 2000 - current <=120m2 POOR $650 $1,200
Brick Veneer 2000 - current 121 - 200m2 AS NEW $2,150 $2,950
Brick Veneer 2000 - current 121 - 200m2 GOOD $1,650 $2,250
Brick Veneer 2000 - current 121 - 200m2 FAIR $1,150 $1,650
Brick Veneer 2000 - current 121 - 200m2 POOR $650 $1,200
Brick Veneer 2000 - current 201 - 300m2 AS NEW $2,150 $2,950
Brick Veneer 2000 - current 201 - 300m2 GOOD $1,650 $2,250
Brick Veneer 2000 - current 201 - 300m2 FAIR $1,150 $1,650
Brick Veneer 2000 - current 201 - 300m2 POOR $650 $1,200
Brick Veneer 2000 - current >=301m2 AS NEW $2,100 $2,900
Brick Veneer 2000 - current >=301m2 GOOD $1,600 $2,200
Brick Veneer 2000 - current >=301m2 FAIR $1,100 $1,600
Brick Veneer 2000 - current >=301m2 POOR $650 $1,200
Concrete Pre 1930 <=120m2 AS NEW $2,000 $2,900
Concrete Pre 1930 <=120m2 GOOD $1,650 $2,250
Concrete Pre 1930 <=120m2 FAIR $1,250 $1,750
Concrete Pre 1930 <=120m2 POOR $650 $1,200
Concrete Pre 1930 121 - 200m2 AS NEW $2,000 $2,900
Concrete Pre 1930 121 - 200m2 GOOD $1,650 $2,250
Concrete Pre 1930 121 - 200m2 FAIR $1,250 $1,750
Concrete Pre 1930 121 - 200m2 POOR $650 $1,200
Concrete Pre 1930 201 - 300m2 AS NEW $2,000 $2,900
Concrete Pre 1930 201 - 300m2 GOOD $1,650 $2,250
Concrete Pre 1930 201 - 300m2 FAIR $1,250 $1,750
Concrete Pre 1930 201 - 300m2 POOR $650 $1,200
Concrete Pre 1930 >=301m2 AS NEW $2,000 $2,900
Concrete Pre 1930 >=301m2 GOOD $1,650 $2,250
Concrete Pre 1930 >=301m2 FAIR $1,250 $1,750
Concrete Pre 1930 >=301m2 POOR $650 $1,200
Concrete 1930 - 1939 <=120m2 AS NEW $2,000 $2,900
Concrete 1930 - 1939 <=120m2 GOOD $1,650 $2,250
Concrete 1930 - 1939 <=120m2 FAIR $1,250 $1,750
Concrete 1930 - 1939 <=120m2 POOR $650 $1,200
Concrete 1930 - 1939 121 - 200m2 AS NEW $1,950 $2,850
Concrete 1930 - 1939 121 - 200m2 GOOD $1,600 $2,200
Concrete 1930 - 1939 121 - 200m2 FAIR $1,200 $1,700
Concrete 1930 - 1939 121 - 200m2 POOR $650 $1,200
Concrete 1930 - 1939 201 - 300m2 AS NEW $1,950 $2,850
Concrete 1930 - 1939 201 - 300m2 GOOD $1,600 $2,200
Concrete 1930 - 1939 201 - 300m2 FAIR $1,200 $1,700
Concrete 1930 - 1939 201 - 300m2 POOR $650 $1,200
Concrete 1930 - 1939 >=301m2 AS NEW $1,900 $2,800
Concrete 1930 - 1939 >=301m2 GOOD $1,550 $2,150
Concrete 1930 - 1939 >=301m2 FAIR $1,150 $1,650
Concrete 1930 - 1939 >=301m2 POOR $650 $1,200
Concrete 1940 - 1959 <=120m2 AS NEW $2,000 $2,900
Concrete 1940 - 1959 <=120m2 GOOD $1,650 $2,250
Concrete 1940 - 1959 <=120m2 FAIR $1,250 $1,750
Concrete 1940 - 1959 <=120m2 POOR $650 $1,200
Concrete 1940 - 1959 121 - 200m2 AS NEW $1,950 $2,850
Concrete 1940 - 1959 121 - 200m2 GOOD $1,600 $2,200
Concrete 1940 - 1959 121 - 200m2 FAIR $1,200 $1,700
Concrete 1940 - 1959 121 - 200m2 POOR $650 $1,200
Concrete 1940 - 1959 201 - 300m2 AS NEW $1,950 $2,850
Concrete 1940 - 1959 201 - 300m2 GOOD $1,600 $2,200
Concrete 1940 - 1959 201 - 300m2 FAIR $1,200 $1,700
Concrete 1940 - 1959 201 - 300m2 POOR $650 $1,200
Concrete 1940 - 1959 >=301m2 AS NEW $1,900 $2,800
Concrete 1940 - 1959 >=301m2 GOOD $1,550 $2,150
Concrete 1940 - 1959 >=301m2 FAIR $1,150 $1,650
Concrete 1940 - 1959 >=301m2 POOR $650 $1,200
Concrete 1960 - 1999 <=120m2 AS NEW $2,100 $3,000
Concrete 1960 - 1999 <=120m2 GOOD $1,750 $2,350
Concrete 1960 - 1999 <=120m2 FAIR $1,200 $1,750
Concrete 1960 - 1999 <=120m2 POOR $650 $1,200
Concrete 1960 - 1999 121 - 200m2 AS NEW $2,050 $2,950
Concrete 1960 - 1999 121 - 200m2 GOOD $1,700 $2,300
Concrete 1960 - 1999 121 - 200m2 FAIR $1,200 $1,700
Concrete 1960 - 1999 121 - 200m2 POOR $650 $1,200
Concrete 1960 - 1999 201 - 300m2 AS NEW $2,050 $2,950
Concrete 1960 - 1999 201 - 300m2 GOOD $1,700 $2,300
Concrete 1960 - 1999 201 - 300m2 FAIR $1,200 $1,700
Concrete 1960 - 1999 201 - 300m2 POOR $650 $1,200
Concrete 1960 - 1999 >=301m2 AS NEW $2,000 $2,900
Concrete 1960 - 1999 >=301m2 GOOD $1,650 $2,250
Concrete 1960 - 1999 >=301m2 FAIR $1,150 $1,650
Concrete 1960 - 1999 >=301m2 POOR $650 $1,200
Concrete 2000 - current <=120m2 AS NEW $2,200 $3,100
Concrete 2000 - current <=120m2 GOOD $1,750 $2,400
Concrete 2000 - current <=120m2 FAIR $1,300 $1,650
Concrete 2000 - current <=120m2 POOR $650 $1,200
Concrete 2000 - current 121 - 200m2 AS NEW $2,150 $3,050
Concrete 2000 - current 121 - 200m2 GOOD $1,750 $2,350
Concrete 2000 - current 121 - 200m2 FAIR $1,250 $1,750
Concrete 2000 - current 121 - 200m2 POOR $650 $1,200
Concrete 2000 - current 201 - 300m2 AS NEW $2,150 $3,050
Concrete 2000 - current 201 - 300m2 GOOD $1,750 $2,350
Concrete 2000 - current 201 - 300m2 FAIR $1,250 $1,750
Concrete 2000 - current 201 - 300m2 POOR $650 $1,200
Concrete 2000 - current >=301m2 AS NEW $2,100 $3,000
Concrete 2000 - current >=301m2 GOOD $1,700 $2,300
Concrete 2000 - current >=301m2 FAIR $1,200 $1,700
Concrete 2000 - current >=301m2 POOR $650 $1,200
Concrete block Pre 1930 <=120m2 AS NEW $2,000 $2,900
Concrete block Pre 1930 <=120m2 GOOD $1,650 $2,250
Concrete block Pre 1930 <=120m2 FAIR $1,250 $1,750
Concrete block Pre 1930 <=120m2 POOR $650 $1,200
Concrete block Pre 1930 121 - 200m2 AS NEW $2,000 $2,900
Concrete block Pre 1930 121 - 200m2 GOOD $1,650 $2,250
Concrete block Pre 1930 121 - 200m2 FAIR $1,250 $1,750
Concrete block Pre 1930 121 - 200m2 POOR $650 $1,200
Concrete block Pre 1930 201 - 300m2 AS NEW $2,000 $2,900
Concrete block Pre 1930 201 - 300m2 GOOD $1,650 $2,250
Concrete block Pre 1930 201 - 300m2 FAIR $1,250 $1,750
Concrete block Pre 1930 201 - 300m2 POOR $650 $1,200
Concrete block Pre 1930 >=301m2 AS NEW $2,000 $2,900
Concrete block Pre 1930 >=301m2 GOOD $1,650 $2,250
Concrete block Pre 1930 >=301m2 FAIR $1,250 $1,750
Concrete block Pre 1930 >=301m2 POOR $650 $1,200
Concrete block 1930 - 1939 <=120m2 AS NEW $2,000 $2,900
Concrete block 1930 - 1939 <=120m2 GOOD $1,650 $2,250
Concrete block 1930 - 1939 <=120m2 FAIR $1,250 $1,750
Concrete block 1930 - 1939 <=120m2 POOR $650 $1,200
Concrete block 1930 - 1939 121 - 200m2 AS NEW $1,950 $2,850
Concrete block 1930 - 1939 121 - 200m2 GOOD $1,600 $2,200
Concrete block 1930 - 1939 121 - 200m2 FAIR $1,200 $1,700
Concrete block 1930 - 1939 121 - 200m2 POOR $650 $1,200
Concrete block 1930 - 1939 201 - 300m2 AS NEW $1,950 $2,850
Concrete block 1930 - 1939 201 - 300m2 GOOD $1,600 $2,200
Concrete block 1930 - 1939 201 - 300m2 FAIR $1,200 $1,700
Concrete block 1930 - 1939 201 - 300m2 POOR $650 $1,200
Concrete block 1930 - 1939 >=301m2 AS NEW $1,900 $2,800
Concrete block 1930 - 1939 >=301m2 GOOD $1,550 $2,150
Concrete block 1930 - 1939 >=301m2 FAIR $1,150 $1,650
Concrete block 1930 - 1939 >=301m2 POOR $650 $1,200
Concrete block 1940 - 1959 <=120m2 AS NEW $2,000 $2,900
Concrete block 1940 - 1959 <=120m2 GOOD $1,650 $2,250
Concrete block 1940 - 1959 <=120m2 FAIR $1,250 $1,750
Concrete block 1940 - 1959 <=120m2 POOR $650 $1,200
Concrete block 1940 - 1959 121 - 200m2 AS NEW $1,950 $2,850
Concrete block 1940 - 1959 121 - 200m2 GOOD $1,600 $2,200
Concrete block 1940 - 1959 121 - 200m2 FAIR $1,200 $1,700
Concrete block 1940 - 1959 121 - 200m2 POOR $650 $1,200
Concrete block 1940 - 1959 201 - 300m2 AS NEW $1,950 $2,850
Concrete block 1940 - 1959 201 - 300m2 GOOD $1,600 $2,200
Concrete block 1940 - 1959 201 - 300m2 FAIR $1,200 $1,700
Concrete block 1940 - 1959 201 - 300m2 POOR $650 $1,200
Concrete block 1940 - 1959 >=301m2 AS NEW $1,900 $2,800
Concrete block 1940 - 1959 >=301m2 GOOD $1,550 $2,150
Concrete block 1940 - 1959 >=301m2 FAIR $1,150 $1,650
Concrete block 1940 - 1959 >=301m2 POOR $650 $1,200
Concrete block 1960 - 1999 <=120m2 AS NEW $2,100 $3,000
Concrete block 1960 - 1999 <=120m2 GOOD $1,750 $2,350
Concrete block 1960 - 1999 <=120m2 FAIR $1,200 $1,750
Concrete block 1960 - 1999 <=120m2 POOR $650 $1,200
Concrete block 1960 - 1999 121 - 200m2 AS NEW $2,050 $2,950
Concrete block 1960 - 1999 121 - 200m2 GOOD $1,700 $2,300
Concrete block 1960 - 1999 121 - 200m2 FAIR $1,200 $1,700
Concrete block 1960 - 1999 121 - 200m2 POOR $650 $1,200
Concrete block 1960 - 1999 201 - 300m2 AS NEW $2,050 $2,950
Concrete block 1960 - 1999 201 - 300m2 GOOD $1,700 $2,300
Concrete block 1960 - 1999 201 - 300m2 FAIR $1,200 $1,700
Concrete block 1960 - 1999 201 - 300m2 POOR $650 $1,200
Concrete block 1960 - 1999 >=301m2 AS NEW $2,000 $2,900
Concrete block 1960 - 1999 >=301m2 GOOD $1,650 $2,250
Concrete block 1960 - 1999 >=301m2 FAIR $1,150 $1,650
Concrete block 1960 - 1999 >=301m2 POOR $650 $1,200
Concrete block 2000 - current <=120m2 AS NEW $2,200 $3,100
Concrete block 2000 - current <=120m2 GOOD $1,750 $2,400
Concrete block 2000 - current <=120m2 FAIR $1,300 $1,650
Concrete block 2000 - current <=120m2 POOR $650 $1,200
Concrete block 2000 - current 121 - 200m2 AS NEW $2,150 $3,050
Concrete block 2000 - current 121 - 200m2 GOOD $1,750 $2,350
Concrete block 2000 - current 121 - 200m2 FAIR $1,250 $1,750
Concrete block 2000 - current 121 - 200m2 POOR $650 $1,200
Concrete block 2000 - current 201 - 300m2 AS NEW $2,150 $3,050
Concrete block 2000 - current 201 - 300m2 GOOD $1,750 $2,350
Concrete block 2000 - current 201 - 300m2 FAIR $1,250 $1,750
Concrete block 2000 - current 201 - 300m2 POOR $650 $1,200
Concrete block 2000 - current >=301m2 AS NEW $2,100 $3,000
Concrete block 2000 - current >=301m2 GOOD $1,700 $2,300
Concrete block 2000 - current >=301m2 FAIR $1,200 $1,700
Concrete block 2000 - current >=301m2 POOR $650 $1,200
Double brick Pre 1930 <=120m2 AS NEW $2,000 $2,900
Double brick Pre 1930 <=120m2 GOOD $1,650 $2,250
Double brick Pre 1930 <=120m2 FAIR $1,250 $1,750
Double brick Pre 1930 <=120m2 POOR $650 $1,200
Double brick Pre 1930 121 - 200m2 AS NEW $2,000 $2,900
Double brick Pre 1930 121 - 200m2 GOOD $1,650 $2,250
Double brick Pre 1930 121 - 200m2 FAIR $1,250 $1,750
Double brick Pre 1930 121 - 200m2 POOR $650 $1,200
Double brick Pre 1930 201 - 300m2 AS NEW $2,000 $2,900
Double brick Pre 1930 201 - 300m2 GOOD $1,650 $2,250
Double brick Pre 1930 201 - 300m2 FAIR $1,250 $1,750
Double brick Pre 1930 201 - 300m2 POOR $650 $1,200
Double brick Pre 1930 >=301m2 AS NEW $2,000 $2,900
Double brick Pre 1930 >=301m2 GOOD $1,650 $2,250
Double brick Pre 1930 >=301m2 FAIR $1,250 $1,750
Double brick Pre 1930 >=301m2 POOR $650 $1,200
Double brick 1930 - 1939 <=120m2 AS NEW $2,000 $2,900
Double brick 1930 - 1939 <=120m2 GOOD $1,650 $2,250
Double brick 1930 - 1939 <=120m2 FAIR $1,250 $1,750
Double brick 1930 - 1939 <=120m2 POOR $650 $1,200
Double brick 1930 - 1939 121 - 200m2 AS NEW $1,950 $2,850
Double brick 1930 - 1939 121 - 200m2 GOOD $1,600 $2,200
Double brick 1930 - 1939 121 - 200m2 FAIR $1,200 $1,700
Double brick 1930 - 1939 121 - 200m2 POOR $650 $1,200
Double brick 1930 - 1939 201 - 300m2 AS NEW $1,950 $2,850
Double brick 1930 - 1939 201 - 300m2 GOOD $1,600 $2,200
Double brick 1930 - 1939 201 - 300m2 FAIR $1,200 $1,700
Double brick 1930 - 1939 201 - 300m2 POOR $650 $1,200
Double brick 1930 - 1939 >=301m2 AS NEW $1,900 $2,800
Double brick 1930 - 1939 >=301m2 GOOD $1,550 $2,150
Double brick 1930 - 1939 >=301m2 FAIR $1,150 $1,650
Double brick 1930 - 1939 >=301m2 POOR $650 $1,200
Double brick 1940 - 1959 <=120m2 AS NEW $2,000 $2,900
Double brick 1940 - 1959 <=120m2 GOOD $1,650 $2,250
Double brick 1940 - 1959 <=120m2 FAIR $1,250 $1,750
Double brick 1940 - 1959 <=120m2 POOR $650 $1,200
Double brick 1940 - 1959 121 - 200m2 AS NEW $1,950 $2,850
Double brick 1940 - 1959 121 - 200m2 GOOD $1,600 $2,200
Double brick 1940 - 1959 121 - 200m2 FAIR $1,200 $1,700
Double brick 1940 - 1959 121 - 200m2 POOR $650 $1,200
Double brick 1940 - 1959 201 - 300m2 AS NEW $1,950 $2,850
Double brick 1940 - 1959 201 - 300m2 GOOD $1,600 $2,200
Double brick 1940 - 1959 201 - 300m2 FAIR $1,200 $1,700
Double brick 1940 - 1959 201 - 300m2 POOR $650 $1,200
Double brick 1940 - 1959 >=301m2 AS NEW $1,900 $2,800
Double brick 1940 - 1959 >=301m2 GOOD $1,550 $2,150
Double brick 1940 - 1959 >=301m2 FAIR $1,150 $1,650
Double brick 1940 - 1959 >=301m2 POOR $650 $1,200
Double brick 1960 - 1999 <=120m2 AS NEW $2,100 $3,000
Double brick 1960 - 1999 <=120m2 GOOD $1,750 $2,350
Double brick 1960 - 1999 <=120m2 FAIR $1,200 $1,750
Double brick 1960 - 1999 <=120m2 POOR $650 $1,200
Double brick 1960 - 1999 121 - 200m2 AS NEW $2,050 $2,950
Double brick 1960 - 1999 121 - 200m2 GOOD $1,700 $2,300
Double brick 1960 - 1999 121 - 200m2 FAIR $1,200 $1,700
Double brick 1960 - 1999 121 - 200m2 POOR $650 $1,200
Double brick 1960 - 1999 201 - 300m2 AS NEW $2,050 $2,950
Double brick 1960 - 1999 201 - 300m2 GOOD $1,700 $2,300
Double brick 1960 - 1999 201 - 300m2 FAIR $1,200 $1,700
Double brick 1960 - 1999 201 - 300m2 POOR $650 $1,200
Double brick 1960 - 1999 >=301m2 AS NEW $2,000 $2,900
Double brick 1960 - 1999 >=301m2 GOOD $1,650 $2,250
Double brick 1960 - 1999 >=301m2 FAIR $1,150 $1,650
Double brick 1960 - 1999 >=301m2 POOR $650 $1,200
Double brick 2000 - current <=120m2 AS NEW $2,200 $3,100
Double brick 2000 - current <=120m2 GOOD $1,750 $2,400
Double brick 2000 - current <=120m2 FAIR $1,300 $1,650
Double brick 2000 - current <=120m2 POOR $650 $1,200
Double brick 2000 - current 121 - 200m2 AS NEW $2,150 $3,050
Double brick 2000 - current 121 - 200m2 GOOD $1,750 $2,350
Double brick 2000 - current 121 - 200m2 FAIR $1,250 $1,750
Double brick 2000 - current 121 - 200m2 POOR $650 $1,200
Double brick 2000 - current 201 - 300m2 AS NEW $2,150 $3,050
Double brick 2000 - current 201 - 300m2 GOOD $1,750 $2,350
Double brick 2000 - current 201 - 300m2 FAIR $1,250 $1,750
Double brick 2000 - current 201 - 300m2 POOR $650 $1,200
Double brick 2000 - current >=301m2 AS NEW $2,100 $3,000
Double brick 2000 - current >=301m2 GOOD $1,700 $2,300
Double brick 2000 - current >=301m2 FAIR $1,200 $1,700
Double brick 2000 - current >=301m2 POOR $650 $1,200
Fibrous cement Pre 1930 <=120m2 AS NEW $1,500 $2,100
Fibrous cement Pre 1930 <=120m2 GOOD $700 $1,550
Fibrous cement Pre 1930 <=120m2 FAIR $700 $1,300
Fibrous cement Pre 1930 <=120m2 POOR $650 $950
Fibrous cement Pre 1930 121 - 200m2 AS NEW $1,500 $2,100
Fibrous cement Pre 1930 121 - 200m2 GOOD $1,150 $1,550
Fibrous cement Pre 1930 121 - 200m2 FAIR $900 $1,300
Fibrous cement Pre 1930 121 - 200m2 POOR $650 $950
Fibrous cement Pre 1930 201 - 300m2 AS NEW $1,500 $2,100
Fibrous cement Pre 1930 201 - 300m2 GOOD $1,150 $1,550
Fibrous cement Pre 1930 201 - 300m2 FAIR $900 $1,300
Fibrous cement Pre 1930 201 - 300m2 POOR $650 $950
Fibrous cement Pre 1930 >=301m2 AS NEW $1,500 $2,100
Fibrous cement Pre 1930 >=301m2 GOOD $1,150 $1,550
Fibrous cement Pre 1930 >=301m2 FAIR $900 $1,300
Fibrous cement Pre 1930 >=301m2 POOR $650 $950
Fibrous cement 1930 - 1939 <=120m2 AS NEW $1,500 $2,100
Fibrous cement 1930 - 1939 <=120m2 GOOD $700 $1,550
Fibrous cement 1930 - 1939 <=120m2 FAIR $700 $1,300
Fibrous cement 1930 - 1939 <=120m2 POOR $650 $950
Fibrous cement 1930 - 1939 121 - 200m2 AS NEW $1,500 $2,100
Fibrous cement 1930 - 1939 121 - 200m2 GOOD $1,150 $1,550
Fibrous cement 1930 - 1939 121 - 200m2 FAIR $900 $1,300
Fibrous cement 1930 - 1939 121 - 200m2 POOR $650 $950
Fibrous cement 1930 - 1939 201 - 300m2 AS NEW $1,500 $2,100
Fibrous cement 1930 - 1939 201 - 300m2 GOOD $1,150 $1,550
Fibrous cement 1930 - 1939 201 - 300m2 FAIR $900 $1,300
Fibrous cement 1930 - 1939 201 - 300m2 POOR $650 $950
Fibrous cement 1930 - 1939 >=301m2 AS NEW $1,500 $2,100
Fibrous cement 1930 - 1939 >=301m2 GOOD $1,150 $1,550
Fibrous cement 1930 - 1939 >=301m2 FAIR $900 $1,300
Fibrous cement 1930 - 1939 >=301m2 POOR $650 $950
Fibrous cement 1940 - 1959 <=120m2 AS NEW $1,500 $2,100
Fibrous cement 1940 - 1959 <=120m2 GOOD $700 $1,550
Fibrous cement 1940 - 1959 <=120m2 FAIR $700 $1,300
Fibrous cement 1940 - 1959 <=120m2 POOR $650 $950
Fibrous cement 1940 - 1959 121 - 200m2 AS NEW $1,500 $2,100
Fibrous cement 1940 - 1959 121 - 200m2 GOOD $1,150 $1,550
Fibrous cement 1940 - 1959 121 - 200m2 FAIR $900 $1,300
Fibrous cement 1940 - 1959 121 - 200m2 POOR $650 $950
Fibrous cement 1940 - 1959 201 - 300m2 AS NEW $1,500 $2,100
Fibrous cement 1940 - 1959 201 - 300m2 GOOD $1,150 $1,550
Fibrous cement 1940 - 1959 201 - 300m2 FAIR $900 $1,300
Fibrous cement 1940 - 1959 201 - 300m2 POOR $650 $950
Fibrous cement 1940 - 1959 >=301m2 AS NEW $1,500 $2,100
Fibrous cement 1940 - 1959 >=301m2 GOOD $1,150 $1,550
Fibrous cement 1940 - 1959 >=301m2 FAIR $900 $1,300
Fibrous cement 1940 - 1959 >=301m2 POOR $650 $950
Fibrous cement 1960 - 1999 <=120m2 AS NEW $1,500 $2,100
Fibrous cement 1960 - 1999 <=120m2 GOOD $700 $1,550
Fibrous cement 1960 - 1999 <=120m2 FAIR $700 $1,300
Fibrous cement 1960 - 1999 <=120m2 POOR $650 $950
Fibrous cement 1960 - 1999 121 - 200m2 AS NEW $1,500 $2,100
Fibrous cement 1960 - 1999 121 - 200m2 GOOD $1,150 $1,550
Fibrous cement 1960 - 1999 121 - 200m2 FAIR $900 $1,300
Fibrous cement 1960 - 1999 121 - 200m2 POOR $650 $950
Fibrous cement 1960 - 1999 201 - 300m2 AS NEW $1,500 $2,100
Fibrous cement 1960 - 1999 201 - 300m2 GOOD $1,150 $1,550
Fibrous cement 1960 - 1999 201 - 300m2 FAIR $900 $1,300
Fibrous cement 1960 - 1999 201 - 300m2 POOR $650 $950
Fibrous cement 1960 - 1999 >=301m2 AS NEW $1,500 $2,100
Fibrous cement 1960 - 1999 >=301m2 GOOD $1,150 $1,550
Fibrous cement 1960 - 1999 >=301m2 FAIR $900 $1,300
Fibrous cement 1960 - 1999 >=301m2 POOR $650 $950
Prestige architectural designed 2000 - current 201 - 300m2 AS NEW $1,750 $5,000
Prestige architectural designed 2000 - current 201 - 300m2 GOOD $1,750 $3,500
Prestige architectural designed 2000 - current >=301m2 AS NEW $1,750 $5,000
Prestige architectural designed 2000 - current >=301m2 GOOD $1,750 $3,500
Rendered brick Pre 1930 <=120m2 AS NEW $2,000 $2,900
Rendered brick Pre 1930 <=120m2 GOOD $1,650 $2,250
Rendered brick Pre 1930 <=120m2 FAIR $1,250 $1,750
Rendered brick Pre 1930 <=120m2 POOR $650 $1,200
Rendered brick Pre 1930 121 - 200m2 AS NEW $2,000 $2,900
Rendered brick Pre 1930 121 - 200m2 GOOD $1,650 $2,250
Rendered brick Pre 1930 121 - 200m2 FAIR $1,250 $1,750
Rendered brick Pre 1930 121 - 200m2 POOR $650 $1,200
Rendered brick Pre 1930 201 - 300m2 AS NEW $2,000 $2,900
Rendered brick Pre 1930 201 - 300m2 GOOD $1,650 $2,250
Rendered brick Pre 1930 201 - 300m2 FAIR $1,250 $1,750
Rendered brick Pre 1930 201 - 300m2 POOR $650 $1,200
Rendered brick Pre 1930 >=301m2 AS NEW $2,000 $2,900
Rendered brick Pre 1930 >=301m2 GOOD $1,650 $2,250
Rendered brick Pre 1930 >=301m2 FAIR $1,250 $1,750
Rendered brick Pre 1930 >=301m2 POOR $650 $1,200
Rendered brick 1930 - 1939 <=120m2 AS NEW $2,000 $2,900
Rendered brick 1930 - 1939 <=120m2 GOOD $1,650 $2,250
Rendered brick 1930 - 1939 <=120m2 FAIR $1,250 $1,750
Rendered brick 1930 - 1939 <=120m2 POOR $650 $1,200
Rendered brick 1930 - 1939 121 - 200m2 AS NEW $1,950 $2,850
Rendered brick 1930 - 1939 121 - 200m2 GOOD $1,600 $2,200
Rendered brick 1930 - 1939 121 - 200m2 FAIR $1,200 $1,700
Rendered brick 1930 - 1939 121 - 200m2 POOR $650 $1,200
Rendered brick 1930 - 1939 201 - 300m2 AS NEW $1,950 $2,850
Rendered brick 1930 - 1939 201 - 300m2 GOOD $1,600 $2,200
Rendered brick 1930 - 1939 201 - 300m2 FAIR $1,200 $1,700
Rendered brick 1930 - 1939 201 - 300m2 POOR $650 $1,200
Rendered brick 1930 - 1939 >=301m2 AS NEW $1,900 $2,800
Rendered brick 1930 - 1939 >=301m2 GOOD $1,550 $2,150
Rendered brick 1930 - 1939 >=301m2 FAIR $1,150 $1,650
Rendered brick 1930 - 1939 >=301m2 POOR $650 $1,200
Rendered brick 1940 - 1959 <=120m2 AS NEW $2,000 $2,900
Rendered brick 1940 - 1959 <=120m2 GOOD $1,650 $2,250
Rendered brick 1940 - 1959 <=120m2 FAIR $1,250 $1,750
Rendered brick 1940 - 1959 <=120m2 POOR $650 $1,200
Rendered brick 1940 - 1959 121 - 200m2 AS NEW $1,950 $2,850
Rendered brick 1940 - 1959 121 - 200m2 GOOD $1,600 $2,200
Rendered brick 1940 - 1959 121 - 200m2 FAIR $1,200 $1,700
Rendered brick 1940 - 1959 121 - 200m2 POOR $650 $1,200
Rendered brick 1940 - 1959 201 - 300m2 AS NEW $1,950 $2,850
Rendered brick 1940 - 1959 201 - 300m2 GOOD $1,600 $2,200
Rendered brick 1940 - 1959 201 - 300m2 FAIR $1,200 $1,700
Rendered brick 1940 - 1959 201 - 300m2 POOR $650 $1,200
Rendered brick 1940 - 1959 >=301m2 AS NEW $1,900 $2,800
Rendered brick 1940 - 1959 >=301m2 GOOD $1,550 $2,150
Rendered brick 1940 - 1959 >=301m2 FAIR $1,150 $1,650
Rendered brick 1940 - 1959 >=301m2 POOR $650 $1,200
Rendered brick 1960 - 1999 <=120m2 AS NEW $2,100 $3,000
Rendered brick 1960 - 1999 <=120m2 GOOD $1,750 $2,350
Rendered brick 1960 - 1999 <=120m2 FAIR $1,200 $1,750
Rendered brick 1960 - 1999 <=120m2 POOR $650 $1,200
Rendered brick 1960 - 1999 121 - 200m2 AS NEW $2,050 $2,950
Rendered brick 1960 - 1999 121 - 200m2 GOOD $1,700 $2,300
Rendered brick 1960 - 1999 121 - 200m2 FAIR $1,200 $1,700
Rendered brick 1960 - 1999 121 - 200m2 POOR $650 $1,200
Rendered brick 1960 - 1999 201 - 300m2 AS NEW $2,050 $2,950
Rendered brick 1960 - 1999 201 - 300m2 GOOD $1,700 $2,300
Rendered brick 1960 - 1999 201 - 300m2 FAIR $1,200 $1,700
Rendered brick 1960 - 1999 201 - 300m2 POOR $650 $1,200
Rendered brick 1960 - 1999 >=301m2 AS NEW $2,000 $2,900
Rendered brick 1960 - 1999 >=301m2 GOOD $1,650 $2,250
Rendered brick 1960 - 1999 >=301m2 FAIR $1,150 $1,650
Rendered brick 1960 - 1999 >=301m2 POOR $650 $1,200
Rendered brick 2000 - current <=120m2 AS NEW $2,200 $3,100
Rendered brick 2000 - current <=120m2 GOOD $1,750 $2,400
Rendered brick 2000 - current <=120m2 FAIR $1,300 $1,650
Rendered brick 2000 - current <=120m2 POOR $650 $1,200
Rendered brick 2000 - current 121 - 200m2 AS NEW $2,150 $3,050
Rendered brick 2000 - current 121 - 200m2 GOOD $1,750 $2,350
Rendered brick 2000 - current 121 - 200m2 FAIR $1,250 $1,750
Rendered brick 2000 - current 121 - 200m2 POOR $650 $1,200
Rendered brick 2000 - current 201 - 300m2 AS NEW $2,150 $3,050
Rendered brick 2000 - current 201 - 300m2 GOOD $1,750 $2,350
Rendered brick 2000 - current 201 - 300m2 FAIR $1,250 $1,750
Rendered brick 2000 - current 201 - 300m2 POOR $650 $1,200
Rendered brick 2000 - current >=301m2 AS NEW $2,100 $3,000
Rendered brick 2000 - current >=301m2 GOOD $1,700 $2,300
Rendered brick 2000 - current >=301m2 FAIR $1,200 $1,700
Rendered brick 2000 - current >=301m2 POOR $650 $1,200
Sandstone Pre 1930 <=120m2 AS NEW $2,000 $2,900
Sandstone Pre 1930 <=120m2 GOOD $1,650 $2,250
Sandstone Pre 1930 <=120m2 FAIR $1,250 $1,750
Sandstone Pre 1930 <=120m2 POOR $650 $1,200
Sandstone Pre 1930 121 - 200m2 AS NEW $2,000 $2,900
Sandstone Pre 1930 121 - 200m2 GOOD $1,650 $2,250
Sandstone Pre 1930 121 - 200m2 FAIR $1,250 $1,750
Sandstone Pre 1930 121 - 200m2 POOR $650 $1,200
Sandstone Pre 1930 201 - 300m2 AS NEW $2,000 $2,900
Sandstone Pre 1930 201 - 300m2 GOOD $1,650 $2,250
Sandstone Pre 1930 201 - 300m2 FAIR $1,250 $1,750
Sandstone Pre 1930 201 - 300m2 POOR $650 $1,200
Sandstone Pre 1930 >=301m2 AS NEW $2,000 $2,900
Sandstone Pre 1930 >=301m2 GOOD $1,650 $2,250
Sandstone Pre 1930 >=301m2 FAIR $1,250 $1,750
Sandstone Pre 1930 >=301m2 POOR $650 $1,200
Sandstone 1930 - 1939 <=120m2 AS NEW $2,000 $2,900
Sandstone 1930 - 1939 <=120m2 GOOD $1,650 $2,250
Sandstone 1930 - 1939 <=120m2 FAIR $1,250 $1,750
Sandstone 1930 - 1939 <=120m2 POOR $650 $1,200
Sandstone 1930 - 1939 121 - 200m2 AS NEW $1,950 $2,850
Sandstone 1930 - 1939 121 - 200m2 GOOD $1,600 $2,200
Sandstone 1930 - 1939 121 - 200m2 FAIR $1,200 $1,700
Sandstone 1930 - 1939 121 - 200m2 POOR $650 $1,200
Sandstone 1930 - 1939 201 - 300m2 AS NEW $1,950 $2,850
Sandstone 1930 - 1939 201 - 300m2 GOOD $1,600 $2,200
Sandstone 1930 - 1939 201 - 300m2 FAIR $1,200 $1,700
Sandstone 1930 - 1939 201 - 300m2 POOR $650 $1,200
Sandstone 1930 - 1939 >=301m2 AS NEW $1,900 $2,800
Sandstone 1930 - 1939 >=301m2 GOOD $1,550 $2,150
Sandstone 1930 - 1939 >=301m2 FAIR $1,150 $1,650
Sandstone 1930 - 1939 >=301m2 POOR $650 $1,200
Sandstone 1940 - 1959 <=120m2 AS NEW $2,000 $2,900
Sandstone 1940 - 1959 <=120m2 GOOD $1,650 $2,250
Sandstone 1940 - 1959 <=120m2 FAIR $1,250 $1,750
Sandstone 1940 - 1959 <=120m2 POOR $650 $1,200
Sandstone 1940 - 1959 121 - 200m2 AS NEW $1,950 $2,850
Sandstone 1940 - 1959 121 - 200m2 GOOD $1,600 $2,200
Sandstone 1940 - 1959 121 - 200m2 FAIR $1,200 $1,700
Sandstone 1940 - 1959 121 - 200m2 POOR $650 $1,200
Sandstone 1940 - 1959 201 - 300m2 AS NEW $1,950 $2,850
Sandstone 1940 - 1959 201 - 300m2 GOOD $1,600 $2,200
Sandstone 1940 - 1959 201 - 300m2 FAIR $1,200 $1,700
Sandstone 1940 - 1959 201 - 300m2 POOR $650 $1,200
Sandstone 1940 - 1959 >=301m2 AS NEW $1,900 $2,800
Sandstone 1940 - 1959 >=301m2 GOOD $1,550 $2,150
Sandstone 1940 - 1959 >=301m2 FAIR $1,150 $1,650
Sandstone 1940 - 1959 >=301m2 POOR $650 $1,200
Sandstone 1960 - 1999 <=120m2 AS NEW $2,100 $3,000
Sandstone 1960 - 1999 <=120m2 GOOD $1,750 $2,350
Sandstone 1960 - 1999 <=120m2 FAIR $1,200 $1,750
Sandstone 1960 - 1999 <=120m2 POOR $650 $1,200
Sandstone 1960 - 1999 121 - 200m2 AS NEW $2,050 $2,950
Sandstone 1960 - 1999 121 - 200m2 GOOD $1,700 $2,300
Sandstone 1960 - 1999 121 - 200m2 FAIR $1,200 $1,700
Sandstone 1960 - 1999 121 - 200m2 POOR $650 $1,200
Sandstone 1960 - 1999 201 - 300m2 AS NEW $2,050 $2,950
Sandstone 1960 - 1999 201 - 300m2 GOOD $1,700 $2,300
Sandstone 1960 - 1999 201 - 300m2 FAIR $1,200 $1,700
Sandstone 1960 - 1999 201 - 300m2 POOR $650 $1,200
Sandstone 1960 - 1999 >=301m2 AS NEW $2,000 $2,900
Sandstone 1960 - 1999 >=301m2 GOOD $1,650 $2,250
Sandstone 1960 - 1999 >=301m2 FAIR $1,150 $1,650
Sandstone 1960 - 1999 >=301m2 POOR $650 $1,200
Sandstone 2000 - current <=120m2 AS NEW $2,200 $3,100
Sandstone 2000 - current <=120m2 GOOD $1,750 $2,400
Sandstone 2000 - current <=120m2 FAIR $1,300 $1,650
Sandstone 2000 - current <=120m2 POOR $650 $1,200
Sandstone 2000 - current 121 - 200m2 AS NEW $2,150 $3,050
Sandstone 2000 - current 121 - 200m2 GOOD $1,750 $2,350
Sandstone 2000 - current 121 - 200m2 FAIR $1,250 $1,750
Sandstone 2000 - current 121 - 200m2 POOR $650 $1,200
Sandstone 2000 - current 201 - 300m2 AS NEW $2,150 $3,050
Sandstone 2000 - current 201 - 300m2 GOOD $1,750 $2,350
Sandstone 2000 - current 201 - 300m2 FAIR $1,250 $1,750
Sandstone 2000 - current 201 - 300m2 POOR $650 $1,200
Sandstone 2000 - current >=301m2 AS NEW $2,100 $3,000
Sandstone 2000 - current >=301m2 GOOD $1,700 $2,300
Sandstone 2000 - current >=301m2 FAIR $1,200 $1,700
Sandstone 2000 - current >=301m2 POOR $650 $1,200
Weatherboard Pre 1930 <=120m2 AS NEW $1,500 $2,100
Weatherboard Pre 1930 <=120m2 GOOD $700 $1,550
Weatherboard Pre 1930 <=120m2 FAIR $700 $1,300
Weatherboard Pre 1930 <=120m2 POOR $650 $950
Weatherboard Pre 1930 121 - 200m2 AS NEW $1,500 $2,100
Weatherboard Pre 1930 121 - 200m2 GOOD $1,150 $1,550
Weatherboard Pre 1930 121 - 200m2 FAIR $900 $1,300
Weatherboard Pre 1930 121 - 200m2 POOR $650 $950
Weatherboard Pre 1930 201 - 300m2 AS NEW $1,500 $2,100
Weatherboard Pre 1930 201 - 300m2 GOOD $1,150 $1,550
Weatherboard Pre 1930 201 - 300m2 FAIR $900 $1,300
Weatherboard Pre 1930 201 - 300m2 POOR $650 $950
Weatherboard Pre 1930 >=301m2 AS NEW $1,500 $2,100
Weatherboard Pre 1930 >=301m2 GOOD $1,150 $1,550
Weatherboard Pre 1930 >=301m2 FAIR $900 $1,300
Weatherboard Pre 1930 >=301m2 POOR $650 $950
Weatherboard 1930 - 1939 <=120m2 AS NEW $1,500 $2,100
Weatherboard 1930 - 1939 <=120m2 GOOD $700 $1,550
Weatherboard 1930 - 1939 <=120m2 FAIR $700 $1,300
Weatherboard 1930 - 1939 <=120m2 POOR $650 $950
Weatherboard 1930 - 1939 121 - 200m2 AS NEW $1,500 $2,100
Weatherboard 1930 - 1939 121 - 200m2 GOOD $1,150 $1,550
Weatherboard 1930 - 1939 121 - 200m2 FAIR $900 $1,300
Weatherboard 1930 - 1939 121 - 200m2 POOR $650 $950
Weatherboard 1930 - 1939 201 - 300m2 AS NEW $1,500 $2,100
Weatherboard 1930 - 1939 201 - 300m2 GOOD $1,150 $1,550
Weatherboard 1930 - 1939 201 - 300m2 FAIR $900 $1,300
Weatherboard 1930 - 1939 201 - 300m2 POOR $650 $950
Weatherboard 1930 - 1939 >=301m2 AS NEW $1,500 $2,100
Weatherboard 1930 - 1939 >=301m2 GOOD $1,150 $1,550
Weatherboard 1930 - 1939 >=301m2 FAIR $900 $1,300
Weatherboard 1930 - 1939 >=301m2 POOR $650 $950
Weatherboard 1940 - 1959 <=120m2 AS NEW $1,500 $2,100
Weatherboard 1940 - 1959 <=120m2 GOOD $700 $1,550
Weatherboard 1940 - 1959 <=120m2 FAIR $700 $1,300
Weatherboard 1940 - 1959 <=120m2 POOR $650 $950
Weatherboard 1940 - 1959 121 - 200m2 AS NEW $1,500 $2,100
Weatherboard 1940 - 1959 121 - 200m2 GOOD $1,150 $1,550
Weatherboard 1940 - 1959 121 - 200m2 FAIR $900 $1,300
Weatherboard 1940 - 1959 121 - 200m2 POOR $650 $950
Weatherboard 1940 - 1959 201 - 300m2 AS NEW $1,500 $2,100
Weatherboard 1940 - 1959 201 - 300m2 GOOD $1,150 $1,550
Weatherboard 1940 - 1959 201 - 300m2 FAIR $900 $1,300
Weatherboard 1940 - 1959 201 - 300m2 POOR $650 $950
Weatherboard 1940 - 1959 >=301m2 AS NEW $1,500 $2,100
Weatherboard 1940 - 1959 >=301m2 GOOD $1,150 $1,550
Weatherboard 1940 - 1959 >=301m2 FAIR $900 $1,300
Weatherboard 1940 - 1959 >=301m2 POOR $650 $950
Weatherboard 1960 - 1999 <=120m2 AS NEW $1,500 $2,100
Weatherboard 1960 - 1999 <=120m2 GOOD $700 $1,550
Weatherboard 1960 - 1999 <=120m2 FAIR $700 $1,300
Weatherboard 1960 - 1999 <=120m2 POOR $650 $950
Weatherboard 1960 - 1999 121 - 200m2 AS NEW $1,500 $2,100
Weatherboard 1960 - 1999 121 - 200m2 GOOD $1,150 $1,550
Weatherboard 1960 - 1999 121 - 200m2 FAIR $900 $1,300
Weatherboard 1960 - 1999 121 - 200m2 POOR $650 $950
Weatherboard 1960 - 1999 201 - 300m2 AS NEW $1,500 $2,100
Weatherboard 1960 - 1999 201 - 300m2 GOOD $1,150 $1,550
Weatherboard 1960 - 1999 201 - 300m2 FAIR $900 $1,300
Weatherboard 1960 - 1999 201 - 300m2 POOR $650 $950
Weatherboard 1960 - 1999 >=301m2 AS NEW $1,500 $2,100
Weatherboard 1960 - 1999 >=301m2 GOOD $1,150 $1,550
Weatherboard 1960 - 1999 >=301m2 FAIR $900 $1,300
Weatherboard 1960 - 1999 >=301m2 POOR $650 $950