General overview

There was a strong increase in land values overall in Burwood local government area between July 2021 and July 2022. The movement was relatively consistent across all market segments. The strong increase in values was driven by the residential sector with strong demand. The residential property market was resilient with strong sales activity and increased demand, which led to strong increases.
Burwood local government area continues to be an area in demand, due to its proximity to transport links and to the CBD, as well as several highly regarded schools. Burwood has a good town centre with a regional shopping centre. A local driver of prices within the Burwood local government area is the future Sydney Metro West Project. There are new stations planned at Burwood North, North Strathfield and Five Dock. Burwood North Station will improve the business and retail centre to the south of Parramatta Road.
The completed WestConnex project running through the northern part of the Burwood local government area has benefited Burwood, with the road project easing congestion and reducing traffic movement

Land value trends

Property zone 01 Jul 2021 01 Jul 2022 % change
Residential $15,047,842,184 $17,788,440,125  18.2%
Commercial $554,818,000 $660,266,000  19.0%
Other $33,785,590 $42,109,260  24.6%
Total $15,636,445,774 $18,490,815,385  18.3%

Number of properties by zone

Total number of properties: 7,709

 Residential land values

Residential overview

Overall residential land values in the Burwood local government area showed a strong increase between July 2021 and July 2022. The exceptions were some medium to high density land, which showed a slight increase only. The area continues to be a desirable place to live and work with typically larger sized blocks in leafy suburbs with good access to parks. In addition, this growth has been driven by the proximity and transport links to the Sydney CBD, access to several highly regarded schools, and easy access to major retail shopping centres.


Median land values and sale prices


The above chart shows movement in the property market and land values over a five year period. In areas where there are a low number of sales, median sale prices may not accurately reflect the property market. Land values may not always move directly in line with sale prices due to the influence of other factors, such as building costs.

Typical residential land values

Address 01 Jul 2021 01 Jul 2022 % change
Belmore St, Burwood $7,120,000 $8,010,000  12.5%
Burwood Rd, Burwood $1,870,000 $2,190,000  17.1%
Burwood Rd, Burwood $3,200,000 $3,670,000  14.7%
Burwood Rd, Burwood $10,000,000 $10,500,000  5.0%
George St, Burwood $44,000,000 $46,500,000  5.7%
Gordon St, Burwood $1,850,000 $2,300,000  24.3%
Gordon St, Burwood $4,600,000 $5,100,000  10.9%
Hornsey St, Burwood $2,000,000 $2,200,000  10.0%
Ireland St, Burwood $3,000,000 $3,600,000  20.0%
Meryla St, Burwood $1,900,000 $2,370,000  24.7%
Oxford St, Burwood $1,930,000 $1,980,000  2.6%
Stanley St, Burwood $1,170,000 $1,340,000  14.5%
Sunbeam Ave, Burwood $1,450,000 $1,750,000  20.7%
Tahlee St, Burwood $1,650,000 $2,030,000  23.0%
Devonshire St, Croydon $1,850,000 $2,340,000  26.5%
Ivanhoe Rd, Croydon $1,550,000 $1,830,000  18.1%
Boyle St, Croydon Park $1,380,000 $1,670,000  21.0%
Eden Ave, Croydon Park $1,050,000 $1,230,000  17.1%
Violet St, Croydon Park $1,250,000 $1,580,000  26.4%
Baker St, Enfield $1,150,000 $1,480,000  28.7%
The Boulevarde , Strathfield $3,300,000 $3,600,000  9.1%
White St, Strathfield $1,500,000 $1,940,000  29.3%
Willee St, Strathfield $1,930,000 $2,300,000  19.2%

Commercial overview

Overall commercial land values in the Burwood local government area showed a strong increase between July 2021 and July 2022. This was consistent across all commercial localities. The strong increases were driven by the strategy to improve Parramatta Road urban corridor and influenced by the Sydney Metro West Project to include a station at Burwood North.


Typical commercial land values

Address 01 Jul 2021 01 Jul 2022 % change
Liverpool Rd, Burwood $941,000 $1,180,000  25.4%
Parramatta Rd, Croydon $2,500,000 $2,820,000  12.8%
The Strand , Croydon $1,180,000 $1,500,000  27.1%
Georges River Rd, Croydon Park $703,000 $800,000  13.8%

The added value of improvement tables show dollar values per square metre for the added value of improvements for the main residential property types in a local government area. It is the value the improvements add to the value of the land as demonstrated by the analysis of property sales.


Added value of improvement

Construction
/Style
Age Size Condition Lower
Value
Higher
Value
Asbestos cement 1930 - 1939 <=120m2 AS NEW $2,200 $3,200
Asbestos cement 1930 - 1939 <=120m2 GOOD $1,400 $2,400
Asbestos cement 1930 - 1939 <=120m2 FAIR $600 $1,600
Asbestos cement 1930 - 1939 <=120m2 POOR $300 $800
Asbestos cement 1930 - 1939 121 - 200m2 AS NEW $2,200 $3,200
Asbestos cement 1930 - 1939 121 - 200m2 GOOD $1,400 $2,400
Asbestos cement 1930 - 1939 121 - 200m2 FAIR $600 $1,600
Asbestos cement 1930 - 1939 121 - 200m2 POOR $300 $800
Asbestos cement 1930 - 1939 201 - 300m2 AS NEW $2,150 $3,150
Asbestos cement 1930 - 1939 201 - 300m2 GOOD $1,350 $2,350
Asbestos cement 1930 - 1939 201 - 300m2 FAIR $550 $1,550
Asbestos cement 1930 - 1939 201 - 300m2 POOR $250 $750
Asbestos cement 1930 - 1939 >=301m2 AS NEW $2,100 $3,100
Asbestos cement 1930 - 1939 >=301m2 GOOD $1,300 $2,300
Asbestos cement 1930 - 1939 >=301m2 FAIR $500 $1,500
Asbestos cement 1930 - 1939 >=301m2 POOR $200 $700
Asbestos cement 1940 - 1959 <=120m2 AS NEW $2,200 $3,200
Asbestos cement 1940 - 1959 <=120m2 GOOD $1,400 $2,400
Asbestos cement 1940 - 1959 <=120m2 FAIR $600 $1,600
Asbestos cement 1940 - 1959 <=120m2 POOR $300 $800
Asbestos cement 1940 - 1959 121 - 200m2 AS NEW $2,200 $3,200
Asbestos cement 1940 - 1959 121 - 200m2 GOOD $1,400 $2,400
Asbestos cement 1940 - 1959 121 - 200m2 FAIR $600 $1,600
Asbestos cement 1940 - 1959 121 - 200m2 POOR $300 $800
Asbestos cement 1940 - 1959 201 - 300m2 AS NEW $2,150 $3,150
Asbestos cement 1940 - 1959 201 - 300m2 GOOD $1,350 $2,350
Asbestos cement 1940 - 1959 201 - 300m2 FAIR $550 $1,550
Asbestos cement 1940 - 1959 201 - 300m2 POOR $250 $750
Asbestos cement 1940 - 1959 >=301m2 AS NEW $2,100 $3,100
Asbestos cement 1940 - 1959 >=301m2 GOOD $1,300 $2,300
Asbestos cement 1940 - 1959 >=301m2 FAIR $500 $1,500
Asbestos cement 1940 - 1959 >=301m2 POOR $200 $700
Asbestos cement 1960 - 1999 <=120m2 AS NEW $2,250 $3,250
Asbestos cement 1960 - 1999 <=120m2 GOOD $1,450 $2,450
Asbestos cement 1960 - 1999 <=120m2 FAIR $650 $1,650
Asbestos cement 1960 - 1999 <=120m2 POOR $350 $850
Asbestos cement 1960 - 1999 121 - 200m2 AS NEW $2,250 $3,250
Asbestos cement 1960 - 1999 121 - 200m2 GOOD $1,450 $2,450
Asbestos cement 1960 - 1999 121 - 200m2 FAIR $650 $1,650
Asbestos cement 1960 - 1999 121 - 200m2 POOR $350 $850
Asbestos cement 1960 - 1999 201 - 300m2 AS NEW $2,200 $3,200
Asbestos cement 1960 - 1999 201 - 300m2 GOOD $1,400 $2,400
Asbestos cement 1960 - 1999 201 - 300m2 FAIR $600 $1,600
Asbestos cement 1960 - 1999 201 - 300m2 POOR $300 $800
Asbestos cement 1960 - 1999 >=301m2 AS NEW $2,150 $3,150
Asbestos cement 1960 - 1999 >=301m2 GOOD $1,350 $2,350
Asbestos cement 1960 - 1999 >=301m2 FAIR $550 $1,550
Asbestos cement 1960 - 1999 >=301m2 POOR $250 $750
Brick Veneer 1960 - 1999 <=120m2 AS NEW $2,800 $4,300
Brick Veneer 1960 - 1999 <=120m2 GOOD $1,800 $3,300
Brick Veneer 1960 - 1999 <=120m2 FAIR $1,300 $2,300
Brick Veneer 1960 - 1999 <=120m2 POOR $800 $1,800
Brick Veneer 1960 - 1999 121 - 200m2 AS NEW $2,700 $4,200
Brick Veneer 1960 - 1999 121 - 200m2 GOOD $1,700 $3,200
Brick Veneer 1960 - 1999 121 - 200m2 FAIR $1,200 $2,200
Brick Veneer 1960 - 1999 121 - 200m2 POOR $700 $1,700
Brick Veneer 1960 - 1999 201 - 300m2 AS NEW $2,600 $4,100
Brick Veneer 1960 - 1999 201 - 300m2 GOOD $1,600 $3,100
Brick Veneer 1960 - 1999 201 - 300m2 FAIR $1,100 $2,100
Brick Veneer 1960 - 1999 201 - 300m2 POOR $600 $1,600
Brick Veneer 1960 - 1999 >=301m2 AS NEW $2,500 $4,000
Brick Veneer 1960 - 1999 >=301m2 GOOD $1,500 $3,000
Brick Veneer 1960 - 1999 >=301m2 FAIR $1,000 $2,000
Brick Veneer 1960 - 1999 >=301m2 POOR $500 $1,500
Brick Veneer 2000 - current <=120m2 AS NEW $2,900 $4,400
Brick Veneer 2000 - current <=120m2 GOOD $1,800 $3,400
Brick Veneer 2000 - current <=120m2 FAIR $1,400 $2,400
Brick Veneer 2000 - current <=120m2 POOR $900 $1,900
Brick Veneer 2000 - current 121 - 200m2 AS NEW $2,800 $4,300
Brick Veneer 2000 - current 121 - 200m2 GOOD $1,800 $3,300
Brick Veneer 2000 - current 121 - 200m2 FAIR $1,300 $2,300
Brick Veneer 2000 - current 121 - 200m2 POOR $800 $1,800
Brick Veneer 2000 - current 201 - 300m2 AS NEW $2,700 $4,200
Brick Veneer 2000 - current 201 - 300m2 GOOD $1,700 $3,200
Brick Veneer 2000 - current 201 - 300m2 FAIR $1,200 $2,200
Brick Veneer 2000 - current 201 - 300m2 POOR $700 $1,700
Brick Veneer 2000 - current >=301m2 AS NEW $2,600 $4,100
Brick Veneer 2000 - current >=301m2 GOOD $1,600 $3,100
Brick Veneer 2000 - current >=301m2 FAIR $1,100 $2,100
Brick Veneer 2000 - current >=301m2 POOR $600 $1,600
Concrete Pre 1930 <=120m2 AS NEW $3,500 $5,500
Concrete Pre 1930 <=120m2 GOOD $2,600 $4,600
Concrete Pre 1930 <=120m2 FAIR $1,500 $3,500
Concrete Pre 1930 <=120m2 POOR $900 $2,000
Concrete Pre 1930 121 - 200m2 AS NEW $3,400 $5,400
Concrete Pre 1930 121 - 200m2 GOOD $2,500 $4,500
Concrete Pre 1930 121 - 200m2 FAIR $1,400 $3,400
Concrete Pre 1930 121 - 200m2 POOR $800 $1,900
Concrete Pre 1930 201 - 300m2 AS NEW $3,300 $5,300
Concrete Pre 1930 201 - 300m2 GOOD $2,400 $4,400
Concrete Pre 1930 201 - 300m2 FAIR $1,300 $3,300
Concrete Pre 1930 201 - 300m2 POOR $800 $1,800
Concrete Pre 1930 >=301m2 AS NEW $3,200 $5,200
Concrete Pre 1930 >=301m2 GOOD $2,300 $4,300
Concrete Pre 1930 >=301m2 FAIR $1,200 $3,200
Concrete Pre 1930 >=301m2 POOR $700 $1,700
Concrete 1930 - 1939 <=120m2 AS NEW $3,500 $5,500
Concrete 1930 - 1939 <=120m2 GOOD $2,600 $4,600
Concrete 1930 - 1939 <=120m2 FAIR $1,500 $3,500
Concrete 1930 - 1939 <=120m2 POOR $900 $2,000
Concrete 1930 - 1939 121 - 200m2 AS NEW $3,400 $5,400
Concrete 1930 - 1939 121 - 200m2 GOOD $2,500 $4,500
Concrete 1930 - 1939 121 - 200m2 FAIR $1,400 $3,400
Concrete 1930 - 1939 121 - 200m2 POOR $800 $1,900
Concrete 1930 - 1939 201 - 300m2 AS NEW $3,300 $5,300
Concrete 1930 - 1939 201 - 300m2 GOOD $2,400 $4,400
Concrete 1930 - 1939 201 - 300m2 FAIR $1,300 $3,300
Concrete 1930 - 1939 201 - 300m2 POOR $800 $1,800
Concrete 1930 - 1939 >=301m2 AS NEW $3,200 $5,200
Concrete 1930 - 1939 >=301m2 GOOD $2,300 $4,300
Concrete 1930 - 1939 >=301m2 FAIR $1,200 $3,200
Concrete 1930 - 1939 >=301m2 POOR $700 $1,700
Concrete 1940 - 1959 <=120m2 AS NEW $3,400 $5,400
Concrete 1940 - 1959 <=120m2 GOOD $2,500 $4,500
Concrete 1940 - 1959 <=120m2 FAIR $1,400 $3,400
Concrete 1940 - 1959 <=120m2 POOR $900 $1,900
Concrete 1940 - 1959 121 - 200m2 AS NEW $3,300 $5,300
Concrete 1940 - 1959 121 - 200m2 GOOD $2,400 $4,400
Concrete 1940 - 1959 121 - 200m2 FAIR $1,300 $3,300
Concrete 1940 - 1959 121 - 200m2 POOR $800 $1,800
Concrete 1940 - 1959 201 - 300m2 AS NEW $3,200 $5,200
Concrete 1940 - 1959 201 - 300m2 GOOD $2,300 $4,300
Concrete 1940 - 1959 201 - 300m2 FAIR $1,200 $3,200
Concrete 1940 - 1959 201 - 300m2 POOR $700 $1,700
Concrete 1940 - 1959 >=301m2 AS NEW $3,100 $5,100
Concrete 1940 - 1959 >=301m2 GOOD $2,200 $4,200
Concrete 1940 - 1959 >=301m2 FAIR $1,100 $3,100
Concrete 1940 - 1959 >=301m2 POOR $600 $1,600
Concrete 1960 - 1999 <=120m2 AS NEW $3,400 $5,400
Concrete 1960 - 1999 <=120m2 GOOD $2,100 $4,500
Concrete 1960 - 1999 <=120m2 FAIR $1,400 $3,400
Concrete 1960 - 1999 <=120m2 POOR $900 $1,900
Concrete 1960 - 1999 121 - 200m2 AS NEW $3,300 $5,300
Concrete 1960 - 1999 121 - 200m2 GOOD $2,000 $4,400
Concrete 1960 - 1999 121 - 200m2 FAIR $1,300 $3,300
Concrete 1960 - 1999 121 - 200m2 POOR $800 $1,800
Concrete 1960 - 1999 201 - 300m2 AS NEW $3,200 $5,200
Concrete 1960 - 1999 201 - 300m2 GOOD $1,900 $4,300
Concrete 1960 - 1999 201 - 300m2 FAIR $1,200 $3,200
Concrete 1960 - 1999 201 - 300m2 POOR $700 $1,700
Concrete 1960 - 1999 >=301m2 AS NEW $3,100 $5,100
Concrete 1960 - 1999 >=301m2 GOOD $1,800 $4,200
Concrete 1960 - 1999 >=301m2 FAIR $1,100 $3,100
Concrete 1960 - 1999 >=301m2 POOR $600 $1,600
Concrete 2000 - current <=120m2 AS NEW $3,500 $5,500
Concrete 2000 - current <=120m2 GOOD $2,200 $4,600
Concrete 2000 - current <=120m2 FAIR $1,500 $3,500
Concrete 2000 - current <=120m2 POOR $1,000 $2,000
Concrete 2000 - current 121 - 200m2 AS NEW $3,400 $5,400
Concrete 2000 - current 121 - 200m2 GOOD $2,100 $4,500
Concrete 2000 - current 121 - 200m2 FAIR $1,400 $3,400
Concrete 2000 - current 121 - 200m2 POOR $900 $1,900
Concrete 2000 - current 201 - 300m2 AS NEW $3,300 $5,300
Concrete 2000 - current 201 - 300m2 GOOD $2,000 $4,400
Concrete 2000 - current 201 - 300m2 FAIR $1,300 $3,300
Concrete 2000 - current 201 - 300m2 POOR $800 $1,800
Concrete 2000 - current >=301m2 AS NEW $3,150 $5,150
Concrete 2000 - current >=301m2 GOOD $2,000 $4,250
Concrete 2000 - current >=301m2 FAIR $1,150 $3,150
Concrete 2000 - current >=301m2 POOR $650 $1,650
Concrete block Pre 1930 <=120m2 AS NEW $3,500 $5,500
Concrete block Pre 1930 <=120m2 GOOD $2,600 $4,600
Concrete block Pre 1930 <=120m2 FAIR $1,500 $3,500
Concrete block Pre 1930 <=120m2 POOR $900 $2,000
Concrete block Pre 1930 121 - 200m2 AS NEW $3,400 $5,400
Concrete block Pre 1930 121 - 200m2 GOOD $2,500 $4,500
Concrete block Pre 1930 121 - 200m2 FAIR $1,400 $3,400
Concrete block Pre 1930 121 - 200m2 POOR $800 $1,900
Concrete block Pre 1930 201 - 300m2 AS NEW $3,300 $5,300
Concrete block Pre 1930 201 - 300m2 GOOD $2,400 $4,400
Concrete block Pre 1930 201 - 300m2 FAIR $1,300 $3,300
Concrete block Pre 1930 201 - 300m2 POOR $800 $1,800
Concrete block Pre 1930 >=301m2 AS NEW $3,200 $5,200
Concrete block Pre 1930 >=301m2 GOOD $2,300 $4,300
Concrete block Pre 1930 >=301m2 FAIR $1,200 $3,200
Concrete block Pre 1930 >=301m2 POOR $700 $1,700
Concrete block 1930 - 1939 <=120m2 AS NEW $3,500 $5,500
Concrete block 1930 - 1939 <=120m2 GOOD $2,600 $4,600
Concrete block 1930 - 1939 <=120m2 FAIR $1,500 $3,500
Concrete block 1930 - 1939 <=120m2 POOR $900 $2,000
Concrete block 1930 - 1939 121 - 200m2 AS NEW $3,400 $5,400
Concrete block 1930 - 1939 121 - 200m2 GOOD $2,500 $4,500
Concrete block 1930 - 1939 121 - 200m2 FAIR $1,400 $3,400
Concrete block 1930 - 1939 121 - 200m2 POOR $800 $1,900
Concrete block 1930 - 1939 201 - 300m2 AS NEW $3,300 $5,300
Concrete block 1930 - 1939 201 - 300m2 GOOD $2,400 $4,400
Concrete block 1930 - 1939 201 - 300m2 FAIR $1,300 $3,300
Concrete block 1930 - 1939 201 - 300m2 POOR $800 $1,800
Concrete block 1930 - 1939 >=301m2 AS NEW $3,200 $5,200
Concrete block 1930 - 1939 >=301m2 GOOD $2,300 $4,300
Concrete block 1930 - 1939 >=301m2 FAIR $1,200 $3,200
Concrete block 1930 - 1939 >=301m2 POOR $700 $1,700
Concrete block 1940 - 1959 <=120m2 AS NEW $3,400 $5,400
Concrete block 1940 - 1959 <=120m2 GOOD $2,500 $4,500
Concrete block 1940 - 1959 <=120m2 FAIR $1,400 $3,400
Concrete block 1940 - 1959 <=120m2 POOR $900 $1,900
Concrete block 1940 - 1959 121 - 200m2 AS NEW $3,300 $5,300
Concrete block 1940 - 1959 121 - 200m2 GOOD $2,400 $4,400
Concrete block 1940 - 1959 121 - 200m2 FAIR $1,300 $3,300
Concrete block 1940 - 1959 121 - 200m2 POOR $800 $1,800
Concrete block 1940 - 1959 201 - 300m2 AS NEW $3,200 $5,200
Concrete block 1940 - 1959 201 - 300m2 GOOD $2,300 $4,300
Concrete block 1940 - 1959 201 - 300m2 FAIR $1,200 $3,200
Concrete block 1940 - 1959 201 - 300m2 POOR $700 $1,700
Concrete block 1940 - 1959 >=301m2 AS NEW $3,100 $5,100
Concrete block 1940 - 1959 >=301m2 GOOD $2,200 $4,200
Concrete block 1940 - 1959 >=301m2 FAIR $1,100 $3,100
Concrete block 1940 - 1959 >=301m2 POOR $600 $1,600
Concrete block 1960 - 1999 <=120m2 AS NEW $3,400 $5,400
Concrete block 1960 - 1999 <=120m2 GOOD $2,100 $4,500
Concrete block 1960 - 1999 <=120m2 FAIR $1,400 $3,400
Concrete block 1960 - 1999 <=120m2 POOR $900 $1,900
Concrete block 1960 - 1999 121 - 200m2 AS NEW $3,300 $5,300
Concrete block 1960 - 1999 121 - 200m2 GOOD $2,000 $4,400
Concrete block 1960 - 1999 121 - 200m2 FAIR $1,300 $3,300
Concrete block 1960 - 1999 121 - 200m2 POOR $800 $1,800
Concrete block 1960 - 1999 201 - 300m2 AS NEW $3,200 $5,200
Concrete block 1960 - 1999 201 - 300m2 GOOD $1,900 $4,300
Concrete block 1960 - 1999 201 - 300m2 FAIR $1,200 $3,200
Concrete block 1960 - 1999 201 - 300m2 POOR $700 $1,700
Concrete block 1960 - 1999 >=301m2 AS NEW $3,100 $5,100
Concrete block 1960 - 1999 >=301m2 GOOD $1,800 $4,200
Concrete block 1960 - 1999 >=301m2 FAIR $1,100 $3,100
Concrete block 1960 - 1999 >=301m2 POOR $600 $1,600
Concrete block 2000 - current <=120m2 AS NEW $3,500 $5,500
Concrete block 2000 - current <=120m2 GOOD $2,200 $4,600
Concrete block 2000 - current <=120m2 FAIR $1,500 $3,500
Concrete block 2000 - current <=120m2 POOR $1,000 $2,000
Concrete block 2000 - current 121 - 200m2 AS NEW $3,400 $5,400
Concrete block 2000 - current 121 - 200m2 GOOD $2,100 $4,500
Concrete block 2000 - current 121 - 200m2 FAIR $1,400 $3,400
Concrete block 2000 - current 121 - 200m2 POOR $900 $1,900
Concrete block 2000 - current 201 - 300m2 AS NEW $3,300 $5,300
Concrete block 2000 - current 201 - 300m2 GOOD $2,000 $4,400
Concrete block 2000 - current 201 - 300m2 FAIR $1,300 $3,300
Concrete block 2000 - current 201 - 300m2 POOR $800 $1,800
Concrete block 2000 - current >=301m2 AS NEW $3,150 $5,150
Concrete block 2000 - current >=301m2 GOOD $2,000 $4,250
Concrete block 2000 - current >=301m2 FAIR $1,150 $3,150
Concrete block 2000 - current >=301m2 POOR $650 $1,650
Double brick Pre 1930 <=120m2 AS NEW $3,500 $5,500
Double brick Pre 1930 <=120m2 GOOD $2,600 $4,600
Double brick Pre 1930 <=120m2 FAIR $1,500 $3,500
Double brick Pre 1930 <=120m2 POOR $900 $2,000
Double brick Pre 1930 121 - 200m2 AS NEW $3,400 $5,400
Double brick Pre 1930 121 - 200m2 GOOD $2,500 $4,500
Double brick Pre 1930 121 - 200m2 FAIR $1,400 $3,400
Double brick Pre 1930 121 - 200m2 POOR $800 $1,900
Double brick Pre 1930 201 - 300m2 AS NEW $3,300 $5,300
Double brick Pre 1930 201 - 300m2 GOOD $2,400 $4,400
Double brick Pre 1930 201 - 300m2 FAIR $1,300 $3,300
Double brick Pre 1930 201 - 300m2 POOR $800 $1,800
Double brick Pre 1930 >=301m2 AS NEW $3,200 $5,200
Double brick Pre 1930 >=301m2 GOOD $2,300 $4,300
Double brick Pre 1930 >=301m2 FAIR $1,200 $3,200
Double brick Pre 1930 >=301m2 POOR $700 $1,700
Double brick 1930 - 1939 <=120m2 AS NEW $3,500 $5,500
Double brick 1930 - 1939 <=120m2 GOOD $2,600 $4,600
Double brick 1930 - 1939 <=120m2 FAIR $1,500 $3,500
Double brick 1930 - 1939 <=120m2 POOR $900 $2,000
Double brick 1930 - 1939 121 - 200m2 AS NEW $3,400 $5,400
Double brick 1930 - 1939 121 - 200m2 GOOD $2,500 $4,500
Double brick 1930 - 1939 121 - 200m2 FAIR $1,400 $3,400
Double brick 1930 - 1939 121 - 200m2 POOR $800 $1,900
Double brick 1930 - 1939 201 - 300m2 AS NEW $3,300 $5,300
Double brick 1930 - 1939 201 - 300m2 GOOD $2,400 $4,400
Double brick 1930 - 1939 201 - 300m2 FAIR $1,300 $3,300
Double brick 1930 - 1939 201 - 300m2 POOR $800 $1,800
Double brick 1930 - 1939 >=301m2 AS NEW $3,200 $5,200
Double brick 1930 - 1939 >=301m2 GOOD $2,300 $4,300
Double brick 1930 - 1939 >=301m2 FAIR $1,200 $3,200
Double brick 1930 - 1939 >=301m2 POOR $700 $1,700
Double brick 1940 - 1959 <=120m2 AS NEW $3,400 $5,400
Double brick 1940 - 1959 <=120m2 GOOD $2,500 $4,500
Double brick 1940 - 1959 <=120m2 FAIR $1,400 $3,400
Double brick 1940 - 1959 <=120m2 POOR $900 $1,900
Double brick 1940 - 1959 121 - 200m2 AS NEW $3,300 $5,300
Double brick 1940 - 1959 121 - 200m2 GOOD $2,400 $4,400
Double brick 1940 - 1959 121 - 200m2 FAIR $1,300 $3,300
Double brick 1940 - 1959 121 - 200m2 POOR $800 $1,800
Double brick 1940 - 1959 201 - 300m2 AS NEW $3,200 $5,200
Double brick 1940 - 1959 201 - 300m2 GOOD $2,300 $4,300
Double brick 1940 - 1959 201 - 300m2 FAIR $1,200 $3,200
Double brick 1940 - 1959 201 - 300m2 POOR $700 $1,700
Double brick 1940 - 1959 >=301m2 AS NEW $3,100 $5,100
Double brick 1940 - 1959 >=301m2 GOOD $2,200 $4,200
Double brick 1940 - 1959 >=301m2 FAIR $1,100 $3,100
Double brick 1940 - 1959 >=301m2 POOR $600 $1,600
Double brick 1960 - 1999 <=120m2 AS NEW $3,400 $5,400
Double brick 1960 - 1999 <=120m2 GOOD $2,100 $4,500
Double brick 1960 - 1999 <=120m2 FAIR $1,400 $3,400
Double brick 1960 - 1999 <=120m2 POOR $900 $1,900
Double brick 1960 - 1999 121 - 200m2 AS NEW $3,300 $5,300
Double brick 1960 - 1999 121 - 200m2 GOOD $2,000 $4,400
Double brick 1960 - 1999 121 - 200m2 FAIR $1,300 $3,300
Double brick 1960 - 1999 121 - 200m2 POOR $800 $1,800
Double brick 1960 - 1999 201 - 300m2 AS NEW $3,200 $5,200
Double brick 1960 - 1999 201 - 300m2 GOOD $1,900 $4,300
Double brick 1960 - 1999 201 - 300m2 FAIR $1,200 $3,200
Double brick 1960 - 1999 201 - 300m2 POOR $700 $1,700
Double brick 1960 - 1999 >=301m2 AS NEW $3,100 $5,100
Double brick 1960 - 1999 >=301m2 GOOD $1,800 $4,200
Double brick 1960 - 1999 >=301m2 FAIR $1,100 $3,100
Double brick 1960 - 1999 >=301m2 POOR $600 $1,600
Double brick 2000 - current <=120m2 AS NEW $3,500 $5,500
Double brick 2000 - current <=120m2 GOOD $2,200 $4,600
Double brick 2000 - current <=120m2 FAIR $1,500 $3,500
Double brick 2000 - current <=120m2 POOR $1,000 $2,000
Double brick 2000 - current 121 - 200m2 AS NEW $3,400 $5,400
Double brick 2000 - current 121 - 200m2 GOOD $2,100 $4,500
Double brick 2000 - current 121 - 200m2 FAIR $1,400 $3,400
Double brick 2000 - current 121 - 200m2 POOR $900 $1,900
Double brick 2000 - current 201 - 300m2 AS NEW $3,300 $5,300
Double brick 2000 - current 201 - 300m2 GOOD $2,000 $4,400
Double brick 2000 - current 201 - 300m2 FAIR $1,300 $3,300
Double brick 2000 - current 201 - 300m2 POOR $800 $1,800
Double brick 2000 - current >=301m2 AS NEW $3,150 $5,150
Double brick 2000 - current >=301m2 GOOD $2,000 $4,250
Double brick 2000 - current >=301m2 FAIR $1,150 $3,150
Double brick 2000 - current >=301m2 POOR $650 $1,650
Fibrous cement 1930 - 1939 <=120m2 AS NEW $2,200 $3,200
Fibrous cement 1930 - 1939 <=120m2 GOOD $1,400 $2,400
Fibrous cement 1930 - 1939 <=120m2 FAIR $600 $1,600
Fibrous cement 1930 - 1939 <=120m2 POOR $300 $800
Fibrous cement 1930 - 1939 121 - 200m2 AS NEW $2,200 $3,200
Fibrous cement 1930 - 1939 121 - 200m2 GOOD $1,400 $2,400
Fibrous cement 1930 - 1939 121 - 200m2 FAIR $600 $1,600
Fibrous cement 1930 - 1939 121 - 200m2 POOR $300 $800
Fibrous cement 1930 - 1939 201 - 300m2 AS NEW $2,150 $3,150
Fibrous cement 1930 - 1939 201 - 300m2 GOOD $1,350 $2,350
Fibrous cement 1930 - 1939 201 - 300m2 FAIR $550 $1,550
Fibrous cement 1930 - 1939 201 - 300m2 POOR $250 $750
Fibrous cement 1930 - 1939 >=301m2 AS NEW $2,100 $3,100
Fibrous cement 1930 - 1939 >=301m2 GOOD $1,300 $2,300
Fibrous cement 1930 - 1939 >=301m2 FAIR $500 $1,500
Fibrous cement 1930 - 1939 >=301m2 POOR $200 $700
Fibrous cement 1940 - 1959 <=120m2 AS NEW $2,200 $3,200
Fibrous cement 1940 - 1959 <=120m2 GOOD $1,400 $2,400
Fibrous cement 1940 - 1959 <=120m2 FAIR $600 $1,600
Fibrous cement 1940 - 1959 <=120m2 POOR $300 $800
Fibrous cement 1940 - 1959 121 - 200m2 AS NEW $2,200 $3,200
Fibrous cement 1940 - 1959 121 - 200m2 GOOD $1,400 $2,400
Fibrous cement 1940 - 1959 121 - 200m2 FAIR $600 $1,600
Fibrous cement 1940 - 1959 121 - 200m2 POOR $300 $800
Fibrous cement 1940 - 1959 201 - 300m2 AS NEW $2,150 $3,150
Fibrous cement 1940 - 1959 201 - 300m2 GOOD $1,350 $2,350
Fibrous cement 1940 - 1959 201 - 300m2 FAIR $550 $1,550
Fibrous cement 1940 - 1959 201 - 300m2 POOR $250 $750
Fibrous cement 1940 - 1959 >=301m2 AS NEW $2,100 $3,100
Fibrous cement 1940 - 1959 >=301m2 GOOD $1,300 $2,300
Fibrous cement 1940 - 1959 >=301m2 FAIR $500 $1,500
Fibrous cement 1940 - 1959 >=301m2 POOR $200 $700
Fibrous cement 1960 - 1999 <=120m2 AS NEW $2,250 $3,250
Fibrous cement 1960 - 1999 <=120m2 GOOD $1,450 $2,450
Fibrous cement 1960 - 1999 <=120m2 FAIR $650 $1,650
Fibrous cement 1960 - 1999 <=120m2 POOR $350 $850
Fibrous cement 1960 - 1999 121 - 200m2 AS NEW $2,250 $3,250
Fibrous cement 1960 - 1999 121 - 200m2 GOOD $1,450 $2,450
Fibrous cement 1960 - 1999 121 - 200m2 FAIR $650 $1,650
Fibrous cement 1960 - 1999 121 - 200m2 POOR $350 $850
Fibrous cement 1960 - 1999 201 - 300m2 AS NEW $2,200 $3,200
Fibrous cement 1960 - 1999 201 - 300m2 GOOD $1,400 $2,400
Fibrous cement 1960 - 1999 201 - 300m2 FAIR $600 $1,600
Fibrous cement 1960 - 1999 201 - 300m2 POOR $300 $800
Fibrous cement 1960 - 1999 >=301m2 AS NEW $2,150 $3,150
Fibrous cement 1960 - 1999 >=301m2 GOOD $1,350 $2,350
Fibrous cement 1960 - 1999 >=301m2 FAIR $550 $1,550
Fibrous cement 1960 - 1999 >=301m2 POOR $250 $750
Prestige architectural designed Pre 1930 <=120m2 AS NEW $4,200 $7,400
Prestige architectural designed Pre 1930 <=120m2 GOOD $3,400 $6,200
Prestige architectural designed Pre 1930 <=120m2 FAIR $2,400 $3,900
Prestige architectural designed Pre 1930 <=120m2 POOR $1,900 $2,900
Prestige architectural designed Pre 1930 121 - 200m2 AS NEW $4,100 $7,300
Prestige architectural designed Pre 1930 121 - 200m2 GOOD $3,300 $6,100
Prestige architectural designed Pre 1930 121 - 200m2 FAIR $2,300 $3,800
Prestige architectural designed Pre 1930 121 - 200m2 POOR $1,800 $2,800
Prestige architectural designed Pre 1930 201 - 300m2 AS NEW $4,000 $7,200
Prestige architectural designed Pre 1930 201 - 300m2 GOOD $3,200 $6,000
Prestige architectural designed Pre 1930 201 - 300m2 FAIR $2,200 $3,700
Prestige architectural designed Pre 1930 201 - 300m2 POOR $1,700 $2,700
Prestige architectural designed Pre 1930 >=301m2 AS NEW $3,900 $7,100
Prestige architectural designed Pre 1930 >=301m2 GOOD $3,100 $5,900
Prestige architectural designed Pre 1930 >=301m2 FAIR $2,100 $3,600
Prestige architectural designed Pre 1930 >=301m2 POOR $1,600 $2,600
Prestige architectural designed 1930 - 1939 <=120m2 AS NEW $4,200 $7,400
Prestige architectural designed 1930 - 1939 <=120m2 GOOD $3,400 $6,200
Prestige architectural designed 1930 - 1939 <=120m2 FAIR $2,400 $3,900
Prestige architectural designed 1930 - 1939 <=120m2 POOR $1,900 $2,900
Prestige architectural designed 1930 - 1939 121 - 200m2 AS NEW $4,100 $7,300
Prestige architectural designed 1930 - 1939 121 - 200m2 GOOD $3,300 $6,100
Prestige architectural designed 1930 - 1939 121 - 200m2 FAIR $2,300 $3,800
Prestige architectural designed 1930 - 1939 121 - 200m2 POOR $1,800 $2,800
Prestige architectural designed 1930 - 1939 201 - 300m2 AS NEW $4,000 $7,200
Prestige architectural designed 1930 - 1939 201 - 300m2 GOOD $3,200 $6,000
Prestige architectural designed 1930 - 1939 201 - 300m2 FAIR $2,200 $3,700
Prestige architectural designed 1930 - 1939 201 - 300m2 POOR $1,700 $2,700
Prestige architectural designed 1930 - 1939 >=301m2 AS NEW $3,900 $7,100
Prestige architectural designed 1930 - 1939 >=301m2 GOOD $3,100 $5,900
Prestige architectural designed 1930 - 1939 >=301m2 FAIR $2,100 $3,600
Prestige architectural designed 1930 - 1939 >=301m2 POOR $1,600 $2,600
Prestige architectural designed 1940 - 1959 <=120m2 AS NEW $4,000 $7,200
Prestige architectural designed 1940 - 1959 <=120m2 GOOD $3,200 $6,000
Prestige architectural designed 1940 - 1959 <=120m2 FAIR $2,200 $3,700
Prestige architectural designed 1940 - 1959 <=120m2 POOR $1,700 $2,700
Prestige architectural designed 1940 - 1959 121 - 200m2 AS NEW $3,900 $7,100
Prestige architectural designed 1940 - 1959 121 - 200m2 GOOD $3,100 $5,900
Prestige architectural designed 1940 - 1959 121 - 200m2 FAIR $2,100 $3,600
Prestige architectural designed 1940 - 1959 121 - 200m2 POOR $1,600 $2,600
Prestige architectural designed 1940 - 1959 201 - 300m2 AS NEW $3,800 $7,000
Prestige architectural designed 1940 - 1959 201 - 300m2 GOOD $3,000 $5,800
Prestige architectural designed 1940 - 1959 201 - 300m2 FAIR $2,000 $3,500
Prestige architectural designed 1940 - 1959 201 - 300m2 POOR $1,500 $2,500
Prestige architectural designed 1940 - 1959 >=301m2 AS NEW $3,700 $6,900
Prestige architectural designed 1940 - 1959 >=301m2 GOOD $2,900 $5,700
Prestige architectural designed 1940 - 1959 >=301m2 FAIR $1,900 $3,400
Prestige architectural designed 1940 - 1959 >=301m2 POOR $1,400 $2,400
Prestige architectural designed 1960 - 1999 <=120m2 AS NEW $4,100 $7,300
Prestige architectural designed 1960 - 1999 <=120m2 GOOD $3,300 $6,100
Prestige architectural designed 1960 - 1999 <=120m2 FAIR $2,300 $3,800
Prestige architectural designed 1960 - 1999 <=120m2 POOR $1,800 $2,800
Prestige architectural designed 1960 - 1999 121 - 200m2 AS NEW $4,000 $7,200
Prestige architectural designed 1960 - 1999 121 - 200m2 GOOD $3,200 $6,000
Prestige architectural designed 1960 - 1999 121 - 200m2 FAIR $2,200 $3,700
Prestige architectural designed 1960 - 1999 121 - 200m2 POOR $1,700 $2,700
Prestige architectural designed 1960 - 1999 201 - 300m2 AS NEW $3,900 $7,100
Prestige architectural designed 1960 - 1999 201 - 300m2 GOOD $3,100 $5,900
Prestige architectural designed 1960 - 1999 201 - 300m2 FAIR $2,100 $3,600
Prestige architectural designed 1960 - 1999 201 - 300m2 POOR $1,600 $2,600
Prestige architectural designed 1960 - 1999 >=301m2 AS NEW $3,800 $7,000
Prestige architectural designed 1960 - 1999 >=301m2 GOOD $3,000 $5,800
Prestige architectural designed 1960 - 1999 >=301m2 FAIR $2,000 $3,500
Prestige architectural designed 1960 - 1999 >=301m2 POOR $1,500 $2,500
Prestige architectural designed 2000 - current <=120m2 AS NEW $4,200 $7,400
Prestige architectural designed 2000 - current <=120m2 GOOD $3,400 $6,200
Prestige architectural designed 2000 - current <=120m2 FAIR $2,400 $3,900
Prestige architectural designed 2000 - current <=120m2 POOR $1,900 $2,900
Prestige architectural designed 2000 - current 121 - 200m2 AS NEW $4,100 $7,300
Prestige architectural designed 2000 - current 121 - 200m2 GOOD $3,300 $6,100
Prestige architectural designed 2000 - current 121 - 200m2 FAIR $2,300 $3,800
Prestige architectural designed 2000 - current 121 - 200m2 POOR $1,800 $2,800
Prestige architectural designed 2000 - current 201 - 300m2 AS NEW $4,000 $7,200
Prestige architectural designed 2000 - current 201 - 300m2 GOOD $3,200 $6,000
Prestige architectural designed 2000 - current 201 - 300m2 FAIR $2,200 $3,700
Prestige architectural designed 2000 - current 201 - 300m2 POOR $1,700 $2,700
Prestige architectural designed 2000 - current >=301m2 AS NEW $3,900 $7,100
Prestige architectural designed 2000 - current >=301m2 GOOD $3,100 $5,900
Prestige architectural designed 2000 - current >=301m2 FAIR $2,100 $3,600
Prestige architectural designed 2000 - current >=301m2 POOR $1,600 $2,600
Rendered brick Pre 1930 <=120m2 AS NEW $3,500 $5,500
Rendered brick Pre 1930 <=120m2 GOOD $2,600 $4,600
Rendered brick Pre 1930 <=120m2 FAIR $1,500 $3,500
Rendered brick Pre 1930 <=120m2 POOR $900 $2,000
Rendered brick Pre 1930 121 - 200m2 AS NEW $3,400 $5,400
Rendered brick Pre 1930 121 - 200m2 GOOD $2,500 $4,500
Rendered brick Pre 1930 121 - 200m2 FAIR $1,400 $3,400
Rendered brick Pre 1930 121 - 200m2 POOR $800 $1,900
Rendered brick Pre 1930 201 - 300m2 AS NEW $3,300 $5,300
Rendered brick Pre 1930 201 - 300m2 GOOD $2,400 $4,400
Rendered brick Pre 1930 201 - 300m2 FAIR $1,300 $3,300
Rendered brick Pre 1930 201 - 300m2 POOR $800 $1,800
Rendered brick Pre 1930 >=301m2 AS NEW $3,200 $5,200
Rendered brick Pre 1930 >=301m2 GOOD $2,300 $4,300
Rendered brick Pre 1930 >=301m2 FAIR $1,200 $3,200
Rendered brick Pre 1930 >=301m2 POOR $700 $1,700
Rendered brick 1930 - 1939 <=120m2 AS NEW $3,500 $5,500
Rendered brick 1930 - 1939 <=120m2 GOOD $2,600 $4,600
Rendered brick 1930 - 1939 <=120m2 FAIR $1,500 $3,500
Rendered brick 1930 - 1939 <=120m2 POOR $900 $2,000
Rendered brick 1930 - 1939 121 - 200m2 AS NEW $3,400 $5,400
Rendered brick 1930 - 1939 121 - 200m2 GOOD $2,500 $4,500
Rendered brick 1930 - 1939 121 - 200m2 FAIR $1,400 $3,400
Rendered brick 1930 - 1939 121 - 200m2 POOR $800 $1,900
Rendered brick 1930 - 1939 201 - 300m2 AS NEW $3,300 $5,300
Rendered brick 1930 - 1939 201 - 300m2 GOOD $2,400 $4,400
Rendered brick 1930 - 1939 201 - 300m2 FAIR $1,300 $3,300
Rendered brick 1930 - 1939 201 - 300m2 POOR $800 $1,800
Rendered brick 1930 - 1939 >=301m2 AS NEW $3,200 $5,200
Rendered brick 1930 - 1939 >=301m2 GOOD $2,300 $4,300
Rendered brick 1930 - 1939 >=301m2 FAIR $1,200 $3,200
Rendered brick 1930 - 1939 >=301m2 POOR $700 $1,700
Rendered brick 1940 - 1959 <=120m2 AS NEW $3,400 $5,400
Rendered brick 1940 - 1959 <=120m2 GOOD $2,500 $4,500
Rendered brick 1940 - 1959 <=120m2 FAIR $1,400 $3,400
Rendered brick 1940 - 1959 <=120m2 POOR $900 $1,900
Rendered brick 1940 - 1959 121 - 200m2 AS NEW $3,300 $5,300
Rendered brick 1940 - 1959 121 - 200m2 GOOD $2,400 $4,400
Rendered brick 1940 - 1959 121 - 200m2 FAIR $1,300 $3,300
Rendered brick 1940 - 1959 121 - 200m2 POOR $800 $1,800
Rendered brick 1940 - 1959 201 - 300m2 AS NEW $3,200 $5,200
Rendered brick 1940 - 1959 201 - 300m2 GOOD $2,300 $4,300
Rendered brick 1940 - 1959 201 - 300m2 FAIR $1,200 $3,200
Rendered brick 1940 - 1959 201 - 300m2 POOR $700 $1,700
Rendered brick 1940 - 1959 >=301m2 AS NEW $3,100 $5,100
Rendered brick 1940 - 1959 >=301m2 GOOD $2,200 $4,200
Rendered brick 1940 - 1959 >=301m2 FAIR $1,100 $3,100
Rendered brick 1940 - 1959 >=301m2 POOR $600 $1,600
Rendered brick 1960 - 1999 <=120m2 AS NEW $3,400 $5,400
Rendered brick 1960 - 1999 <=120m2 GOOD $2,100 $4,500
Rendered brick 1960 - 1999 <=120m2 FAIR $1,400 $3,400
Rendered brick 1960 - 1999 <=120m2 POOR $900 $1,900
Rendered brick 1960 - 1999 121 - 200m2 AS NEW $3,300 $5,300
Rendered brick 1960 - 1999 121 - 200m2 GOOD $2,000 $4,400
Rendered brick 1960 - 1999 121 - 200m2 FAIR $1,300 $3,300
Rendered brick 1960 - 1999 121 - 200m2 POOR $800 $1,800
Rendered brick 1960 - 1999 201 - 300m2 AS NEW $3,200 $5,200
Rendered brick 1960 - 1999 201 - 300m2 GOOD $1,900 $4,300
Rendered brick 1960 - 1999 201 - 300m2 FAIR $1,200 $3,200
Rendered brick 1960 - 1999 201 - 300m2 POOR $700 $1,700
Rendered brick 1960 - 1999 >=301m2 AS NEW $3,100 $5,100
Rendered brick 1960 - 1999 >=301m2 GOOD $1,800 $4,200
Rendered brick 1960 - 1999 >=301m2 FAIR $1,100 $3,100
Rendered brick 1960 - 1999 >=301m2 POOR $600 $1,600
Rendered brick 2000 - current <=120m2 AS NEW $3,500 $5,500
Rendered brick 2000 - current <=120m2 GOOD $2,200 $4,600
Rendered brick 2000 - current <=120m2 FAIR $1,500 $3,500
Rendered brick 2000 - current <=120m2 POOR $1,000 $2,000
Rendered brick 2000 - current 121 - 200m2 AS NEW $3,400 $5,400
Rendered brick 2000 - current 121 - 200m2 GOOD $2,100 $4,500
Rendered brick 2000 - current 121 - 200m2 FAIR $1,400 $3,400
Rendered brick 2000 - current 121 - 200m2 POOR $900 $1,900
Rendered brick 2000 - current 201 - 300m2 AS NEW $3,300 $5,300
Rendered brick 2000 - current 201 - 300m2 GOOD $2,000 $4,400
Rendered brick 2000 - current 201 - 300m2 FAIR $1,300 $3,300
Rendered brick 2000 - current 201 - 300m2 POOR $800 $1,800
Rendered brick 2000 - current >=301m2 AS NEW $3,150 $5,150
Rendered brick 2000 - current >=301m2 GOOD $2,000 $4,250
Rendered brick 2000 - current >=301m2 FAIR $1,150 $3,150
Rendered brick 2000 - current >=301m2 POOR $650 $1,650
Sandstone Pre 1930 <=120m2 AS NEW $3,500 $5,500
Sandstone Pre 1930 <=120m2 GOOD $2,600 $4,600
Sandstone Pre 1930 <=120m2 FAIR $1,500 $3,500
Sandstone Pre 1930 <=120m2 POOR $900 $2,000
Sandstone Pre 1930 121 - 200m2 AS NEW $3,400 $5,400
Sandstone Pre 1930 121 - 200m2 GOOD $2,500 $4,500
Sandstone Pre 1930 121 - 200m2 FAIR $1,400 $3,400
Sandstone Pre 1930 121 - 200m2 POOR $800 $1,900
Sandstone Pre 1930 201 - 300m2 AS NEW $3,300 $5,300
Sandstone Pre 1930 201 - 300m2 GOOD $2,400 $4,400
Sandstone Pre 1930 201 - 300m2 FAIR $1,300 $3,300
Sandstone Pre 1930 201 - 300m2 POOR $800 $1,800
Sandstone Pre 1930 >=301m2 AS NEW $3,200 $5,200
Sandstone Pre 1930 >=301m2 GOOD $2,300 $4,300
Sandstone Pre 1930 >=301m2 FAIR $1,200 $3,200
Sandstone Pre 1930 >=301m2 POOR $700 $1,700
Sandstone 1930 - 1939 <=120m2 AS NEW $3,500 $5,500
Sandstone 1930 - 1939 <=120m2 GOOD $2,600 $4,600
Sandstone 1930 - 1939 <=120m2 FAIR $1,500 $3,500
Sandstone 1930 - 1939 <=120m2 POOR $900 $2,000
Sandstone 1930 - 1939 121 - 200m2 AS NEW $3,400 $5,400
Sandstone 1930 - 1939 121 - 200m2 GOOD $2,500 $4,500
Sandstone 1930 - 1939 121 - 200m2 FAIR $1,400 $3,400
Sandstone 1930 - 1939 121 - 200m2 POOR $800 $1,900
Sandstone 1930 - 1939 201 - 300m2 AS NEW $3,300 $5,300
Sandstone 1930 - 1939 201 - 300m2 GOOD $2,400 $4,400
Sandstone 1930 - 1939 201 - 300m2 FAIR $1,300 $3,300
Sandstone 1930 - 1939 201 - 300m2 POOR $800 $1,800
Sandstone 1930 - 1939 >=301m2 AS NEW $3,200 $5,200
Sandstone 1930 - 1939 >=301m2 GOOD $2,300 $4,300
Sandstone 1930 - 1939 >=301m2 FAIR $1,200 $3,200
Sandstone 1930 - 1939 >=301m2 POOR $700 $1,700
Sandstone 1940 - 1959 <=120m2 AS NEW $3,400 $5,400
Sandstone 1940 - 1959 <=120m2 GOOD $2,500 $4,500
Sandstone 1940 - 1959 <=120m2 FAIR $1,400 $3,400
Sandstone 1940 - 1959 <=120m2 POOR $900 $1,900
Sandstone 1940 - 1959 121 - 200m2 AS NEW $3,300 $5,300
Sandstone 1940 - 1959 121 - 200m2 GOOD $2,400 $4,400
Sandstone 1940 - 1959 121 - 200m2 FAIR $1,300 $3,300
Sandstone 1940 - 1959 121 - 200m2 POOR $800 $1,800
Sandstone 1940 - 1959 201 - 300m2 AS NEW $3,200 $5,200
Sandstone 1940 - 1959 201 - 300m2 GOOD $2,300 $4,300
Sandstone 1940 - 1959 201 - 300m2 FAIR $1,200 $3,200
Sandstone 1940 - 1959 201 - 300m2 POOR $700 $1,700
Sandstone 1940 - 1959 >=301m2 AS NEW $3,100 $5,100
Sandstone 1940 - 1959 >=301m2 GOOD $2,200 $4,200
Sandstone 1940 - 1959 >=301m2 FAIR $1,100 $3,100
Sandstone 1940 - 1959 >=301m2 POOR $600 $1,600
Sandstone 1960 - 1999 <=120m2 AS NEW $3,400 $5,400
Sandstone 1960 - 1999 <=120m2 GOOD $2,100 $4,500
Sandstone 1960 - 1999 <=120m2 FAIR $1,400 $3,400
Sandstone 1960 - 1999 <=120m2 POOR $900 $1,900
Sandstone 1960 - 1999 121 - 200m2 AS NEW $3,300 $5,300
Sandstone 1960 - 1999 121 - 200m2 GOOD $2,000 $4,400
Sandstone 1960 - 1999 121 - 200m2 FAIR $1,300 $3,300
Sandstone 1960 - 1999 121 - 200m2 POOR $800 $1,800
Sandstone 1960 - 1999 201 - 300m2 AS NEW $3,200 $5,200
Sandstone 1960 - 1999 201 - 300m2 GOOD $1,900 $4,300
Sandstone 1960 - 1999 201 - 300m2 FAIR $1,200 $3,200
Sandstone 1960 - 1999 201 - 300m2 POOR $700 $1,700
Sandstone 1960 - 1999 >=301m2 AS NEW $3,100 $5,100
Sandstone 1960 - 1999 >=301m2 GOOD $1,800 $4,200
Sandstone 1960 - 1999 >=301m2 FAIR $1,100 $3,100
Sandstone 1960 - 1999 >=301m2 POOR $600 $1,600
Sandstone 2000 - current <=120m2 AS NEW $3,500 $5,500
Sandstone 2000 - current <=120m2 GOOD $2,200 $4,600
Sandstone 2000 - current <=120m2 FAIR $1,500 $3,500
Sandstone 2000 - current <=120m2 POOR $1,000 $2,000
Sandstone 2000 - current 121 - 200m2 AS NEW $3,400 $5,400
Sandstone 2000 - current 121 - 200m2 GOOD $2,100 $4,500
Sandstone 2000 - current 121 - 200m2 FAIR $1,400 $3,400
Sandstone 2000 - current 121 - 200m2 POOR $900 $1,900
Sandstone 2000 - current 201 - 300m2 AS NEW $3,300 $5,300
Sandstone 2000 - current 201 - 300m2 GOOD $2,000 $4,400
Sandstone 2000 - current 201 - 300m2 FAIR $1,300 $3,300
Sandstone 2000 - current 201 - 300m2 POOR $800 $1,800
Sandstone 2000 - current >=301m2 AS NEW $3,150 $5,150
Sandstone 2000 - current >=301m2 GOOD $2,000 $4,250
Sandstone 2000 - current >=301m2 FAIR $1,150 $3,150
Sandstone 2000 - current >=301m2 POOR $650 $1,650
Weatherboard Pre 1930 <=120m2 AS NEW $3,000 $4,800
Weatherboard Pre 1930 <=120m2 GOOD $2,000 $4,000
Weatherboard Pre 1930 <=120m2 FAIR $1,500 $3,000
Weatherboard Pre 1930 <=120m2 POOR $700 $1,700
Weatherboard Pre 1930 121 - 200m2 AS NEW $2,900 $4,700
Weatherboard Pre 1930 121 - 200m2 GOOD $1,900 $3,900
Weatherboard Pre 1930 121 - 200m2 FAIR $1,400 $2,900
Weatherboard Pre 1930 121 - 200m2 POOR $600 $1,600
Weatherboard Pre 1930 201 - 300m2 AS NEW $2,800 $4,600
Weatherboard Pre 1930 201 - 300m2 GOOD $1,800 $3,800
Weatherboard Pre 1930 201 - 300m2 FAIR $1,300 $2,800
Weatherboard Pre 1930 201 - 300m2 POOR $500 $1,500
Weatherboard Pre 1930 >=301m2 AS NEW $2,700 $4,500
Weatherboard Pre 1930 >=301m2 GOOD $1,700 $3,700
Weatherboard Pre 1930 >=301m2 FAIR $1,200 $2,700
Weatherboard Pre 1930 >=301m2 POOR $400 $1,400
Weatherboard 1930 - 1939 <=120m2 AS NEW $3,000 $4,800
Weatherboard 1930 - 1939 <=120m2 GOOD $2,000 $4,000
Weatherboard 1930 - 1939 <=120m2 FAIR $1,500 $3,000
Weatherboard 1930 - 1939 <=120m2 POOR $700 $1,700
Weatherboard 1930 - 1939 121 - 200m2 AS NEW $2,900 $4,700
Weatherboard 1930 - 1939 121 - 200m2 GOOD $1,900 $3,900
Weatherboard 1930 - 1939 121 - 200m2 FAIR $1,400 $2,900
Weatherboard 1930 - 1939 121 - 200m2 POOR $600 $1,600
Weatherboard 1930 - 1939 201 - 300m2 AS NEW $2,800 $4,600
Weatherboard 1930 - 1939 201 - 300m2 GOOD $1,800 $3,800
Weatherboard 1930 - 1939 201 - 300m2 FAIR $1,300 $2,800
Weatherboard 1930 - 1939 201 - 300m2 POOR $500 $1,500
Weatherboard 1930 - 1939 >=301m2 AS NEW $2,700 $4,500
Weatherboard 1930 - 1939 >=301m2 GOOD $1,700 $3,700
Weatherboard 1930 - 1939 >=301m2 FAIR $1,200 $2,700
Weatherboard 1930 - 1939 >=301m2 POOR $400 $1,400
Weatherboard 1940 - 1959 <=120m2 AS NEW $2,800 $4,600
Weatherboard 1940 - 1959 <=120m2 GOOD $1,800 $3,800
Weatherboard 1940 - 1959 <=120m2 FAIR $1,300 $2,800
Weatherboard 1940 - 1959 <=120m2 POOR $500 $1,500
Weatherboard 1940 - 1959 121 - 200m2 AS NEW $2,700 $4,500
Weatherboard 1940 - 1959 121 - 200m2 GOOD $1,700 $3,700
Weatherboard 1940 - 1959 121 - 200m2 FAIR $1,200 $2,700
Weatherboard 1940 - 1959 121 - 200m2 POOR $400 $1,400
Weatherboard 1940 - 1959 201 - 300m2 AS NEW $2,600 $4,400
Weatherboard 1940 - 1959 201 - 300m2 GOOD $1,600 $3,600
Weatherboard 1940 - 1959 201 - 300m2 FAIR $1,100 $2,600
Weatherboard 1940 - 1959 201 - 300m2 POOR $300 $1,300
Weatherboard 1940 - 1959 >=301m2 AS NEW $2,500 $4,300
Weatherboard 1940 - 1959 >=301m2 GOOD $1,500 $3,500
Weatherboard 1940 - 1959 >=301m2 FAIR $1,000 $2,500
Weatherboard 1940 - 1959 >=301m2 POOR $200 $1,200
Weatherboard 1960 - 1999 <=120m2 AS NEW $2,900 $4,700
Weatherboard 1960 - 1999 <=120m2 GOOD $1,900 $3,900
Weatherboard 1960 - 1999 <=120m2 FAIR $1,400 $2,900
Weatherboard 1960 - 1999 <=120m2 POOR $600 $1,600
Weatherboard 1960 - 1999 121 - 200m2 AS NEW $2,800 $4,600
Weatherboard 1960 - 1999 121 - 200m2 GOOD $1,800 $3,800
Weatherboard 1960 - 1999 121 - 200m2 FAIR $1,300 $2,800
Weatherboard 1960 - 1999 121 - 200m2 POOR $500 $1,500
Weatherboard 1960 - 1999 201 - 300m2 AS NEW $2,700 $4,500
Weatherboard 1960 - 1999 201 - 300m2 GOOD $1,700 $3,700
Weatherboard 1960 - 1999 201 - 300m2 FAIR $1,200 $2,700
Weatherboard 1960 - 1999 201 - 300m2 POOR $400 $1,400
Weatherboard 1960 - 1999 >=301m2 AS NEW $2,600 $4,400
Weatherboard 1960 - 1999 >=301m2 GOOD $1,600 $3,600
Weatherboard 1960 - 1999 >=301m2 FAIR $1,100 $2,600
Weatherboard 1960 - 1999 >=301m2 POOR $300 $1,300
Weatherboard 2000 - current <=120m2 AS NEW $3,000 $4,800
Weatherboard 2000 - current <=120m2 GOOD $2,000 $4,000
Weatherboard 2000 - current <=120m2 FAIR $1,500 $3,000
Weatherboard 2000 - current <=120m2 POOR $700 $1,700
Weatherboard 2000 - current 121 - 200m2 AS NEW $2,900 $4,700
Weatherboard 2000 - current 121 - 200m2 GOOD $1,900 $3,900
Weatherboard 2000 - current 121 - 200m2 FAIR $1,400 $2,900
Weatherboard 2000 - current 121 - 200m2 POOR $600 $1,600
Weatherboard 2000 - current 201 - 300m2 AS NEW $2,800 $4,600
Weatherboard 2000 - current 201 - 300m2 GOOD $1,800 $3,800
Weatherboard 2000 - current 201 - 300m2 FAIR $1,300 $2,800
Weatherboard 2000 - current 201 - 300m2 POOR $500 $1,500
Weatherboard 2000 - current >=301m2 AS NEW $2,700 $4,500
Weatherboard 2000 - current >=301m2 GOOD $1,700 $3,700
Weatherboard 2000 - current >=301m2 FAIR $1,200 $2,700
Weatherboard 2000 - current >=301m2 POOR $400 $1,400